Named in 7 listed projects in ERCOT’s transmission project tracking workbook, in Bell County. First named in the release with data as of February 1, 2015.

Bellcounty as printed
138, 345kV
LCRATSC, ONCORutility
7projects listed

Also printed as: Salado Switch

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Bell, TX: ERCOT queue, 14 active of 14. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Upgrade Killeen Switch - Salado Switch 345 kV Line Ckt #1
ERCOT project 109892 · utility no. R6567
ONCOR
Tier 3
Conceptual
Future tab
345 Dec 2031 Killeen to Salado
Bell County
Killeen, Salado
LCRATSC Gabriel Salado Transmission Line Addition
This project will construct a new 345-kV double-circuit transmission line between Gabriel and Oncor Salado substations. The need for this project with identified by ERCOT in the EIR for RPG 25RPG009.
ERCOT project 110122 · RPG 25RPG009
LCRATSC
Tier 1
Planned
Future tab
345 Dec 2031 Gabriel to Salado Switch
Williamson / Bell County
Gabriel, Salado Switch
Upgrade Salado Switch - Puma 138 kV Line Section
ERCOT project 110336 · utility no. R6570
ONCOR
Tier 4
Conceptual
Future tab
138 Dec 2030 Salado to Puma
Bell County
Salado, Puma
Rebuild Hutto Switch - Salado Switch 345 kV DKCT Line
ERCOT project 110344 · utility no. R6529
ONCOR
Tier 3
Conceptual
Future tab
345 May 2033 Hutto Switch to Salado Switch
Williamson / Bell County
Hutto Switch, Salado Switch
Rebuild the Salado - Bell County 138 kV Line
Rebuild the Salado - Bell County 138 kV Line on new structures
ERCOT project 87673 · utility no. R6280 · RPG 24RPG001
ONCOR
Tier 1
Planned
Future tab
138 May 2027 Salado to Bell County
Bell County
Salado, Bell County
Salado 345/138 kV Autotransformer #1 and #2
Install Salado 345/138 kV Autotransformer #1 and #2
ERCOT project 87707 · utility no. R6354, R6202 · RPG 24RPG001
ONCOR
Tier 1
Planned
Future tab
345 May 2027 Salado to Salado
Bell County
Salado
Rebuild the Paramount - Salado 345 kV DCKT Line
ERCOT project 99387 · utility no. R6358
ONCOR
Tier 1
Planned
Future tab
345 Dec 2028 Tower to Salado
Bell County
Tower, Salado

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
October 1, 2026109892Status as reportedPlanned → Conceptual
October 1, 2026110336Status as reportedPlanned → Conceptual
July 13, 2026109892Projected in-service dateDec 2032 → Dec 2031
July 13, 2026109892First listedon the Future tab
July 13, 2026110122First listedon the Future tab
July 13, 2026110336First listedon the Future tab
July 13, 2026110344First listedon the Future tab
February 1, 202687707Projected in-service dateDec 2027 → May 2027
February 1, 202699387Projected in-service dateMay 2028 → Dec 2028
October 1, 202599387First listedon the Future tab
October 1, 202487673First listedon the Future tab
October 1, 202487707First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.