Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Ellis County. First named in the release with data as of October 1, 2024.

Elliscounty as printed
345kV
ONCORutility
3projects listed

Also printed as: Old Country

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Ellis, TX: ERCOT queue, 26 active of 30. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Venus – Old Country Switch 345 kV Double-Circuit Line
Upgrade Venus – Old Country Switch 345 kV Double-Circuit Line
ERCOT project 109818 · utility no. M4282 · RPG 25RPG040 · RTP 2024-NC56
ONCOR
Tier 1
Planned
Future tab
345 Apr 2030 Venus Switch to Old Country Switch
Ellis County
Venus Switch, Old Country Switch
Old Country Switch - Notus Switch 345 kV Double-Circuit Line
Upgrade Old Country Switch – Notus Switch 345 kV Double-Circuit Line
ERCOT project 109822 · utility no. M4511 · RPG 25RPG040 · RTP 2024-NC42
ONCOR
Tier 1
Planned
Future tab
345 Aug 2030 Old Country Switch to Notus Switch
Ellis County
Old Country Switch, Notus Switch
Old Country 345 kV Switch
ERCOT project 87799 · utility no. M4172
ONCOR
Tier 4
In-Service
Current-year planned tab
345 Oct 2026
actual 2026-07
Old Country
Ellis County
Old Country

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
October 1, 202687799Status as reportedPlanned → In-Service
July 13, 2026109818First listedon the Future tab
July 13, 2026109822First listedon the Future tab
June 1, 202687799Projected in-service dateMay 2026 → Oct 2026
February 1, 202687799Moved between tabsFuture → Current-year planned
February 1, 202687799Projected in-service dateDec 2026 → May 2026
October 1, 202587799Projected in-service dateMay 2026 → Dec 2026
February 1, 202587799Projected in-service dateDec 2025 → May 2026
October 1, 202487799First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.