Hermann
Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Harris County, plus 1 on its Cancelled tab. First named in the release with data as of May 12, 2023.
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Harris, TX: ERCOT queue, 30 active of 35 · MISO queue, 0 active of 1. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Upgrades related to the Baytown Area Load Addition Upgrade Ckt.08 Hermann to Grant to increase thermal limits. ERCOT project 111323D · RTP 26RPG006 |
CNP Tier 3 |
Planned Future tab |
138 | May 2028 | Hermann to Grant Harris County |
Hermann, Grant |
| Install Hermann (HER) Distribution Substation Install Hermann (HER) Distribution Substation. Loop on Ckt.08I to create new Ckt.08 Plaza to Hermann to Grant. ERCOT project 73332 |
CNP Tier 4 |
Planned Future tab |
138 | Oct 2027 | Hermann to Plaza/Grant Harris County |
Hermann, Plaza, Grant |
On the Cancelled tab
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Upgrades related to the Baytown Area Load Addition Upgrade Ckt.08 Hermann to Grant to increase thermal limits. ERCOT project 102546D · RTP 24RPG028 |
CNP Tier 1 |
Conceptual Cancelled tab |
138 | May 2028 | Hermann to Grant Harris County |
Hermann, Grant |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 102546D | Moved between tabs | Future → Cancelled |
| October 1, 2026 | 102546D | Status as reported | Planned → Conceptual |
| October 1, 2026 | 111323D | First listed | on the Future tab |
| June 1, 2026 | 102546D | First listed | on the Future tab |
| October 1, 2025 | 73332 | Moved between tabs | Current-year planned → Future |
| October 1, 2025 | 73332 | Projected in-service date | Dec 2025 → Oct 2027 |
| June 1, 2025 | 73332 | Moved between tabs | Future → Current-year planned |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.