Webster
Named in 5 listed projects in ERCOT’s transmission project tracking workbook, in Harris County. First named in the release with data as of February 1, 2015.
A HIFLD substation record has the same name and county: WEBSTER (HARRIS County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Harris, TX: ERCOT queue, 30 active of 35 · MISO queue, 0 active of 1. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Webster Distribution Upgrades Disconnect Webster TR2 from Ckt.92A service and reconnect at other circuit location (see other entry for TR2). Reconnect Webster TR3 as Ckt.92A El Dorado to WEB-TR3 to Kemah. ERCOT project 100503B |
CNP Tier 4 |
Planned Future tab |
138 | May 2027 | Webster to El Dorado /Kemah Harris County |
Webster, El Dorado, Kemah |
| Webster Distribution Upgrades Disconnect Webster TR2 from Ckt.92A service and reconnect as Ckt.93A PH Robinson to Webster TR1/TR2 to Webster main bus. ERCOT project 100503C |
CNP Tier 4 |
Planned Future tab |
138 | May 2027 | Webster to PH Robinson /Webster Harris County |
Webster, PH Robinson |
| Webster Distribution Upgrades Expand Webster with new TR4 distribution transformer and connect to Ckt.95F Polaris to Webster TR4 to Kemah. ERCOT project 100503D |
CNP Tier 4 |
Planned Future tab |
138 | May 2027 | Webster to Polaris /Kemah Harris County |
Webster, Polaris, Kemah |
| Upgrade to increase thermal limits as part of FRM upgrades Upgrade Ckt.06D NASA to Webster to increase thermal limits as part of FRM upgrades ERCOT project 87479C |
CNP Tier 4 |
Conceptual Current-year planned tab |
138 | Jul 2025 | NASA to Webster Harris County |
NASA, Webster |
| Facility Ratings Methodology (FRM) Upgrades Upgrade Ckt.06D NASA to Webster to increase thermal limits as part of FRM upgrades ERCOT project 90232C |
CNP Tier 4 |
Planned Current-year planned tab |
138 | Aug 2026 | NASA to Webster Harris County |
NASA, Webster |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 90232C | Projected in-service date | Jul 2026 → Aug 2026 |
| July 13, 2026 | 87479C | Status as reported | Planned → Conceptual |
| July 13, 2026 | 90232C | Projected in-service date | Jun 2026 → Jul 2026 |
| July 13, 2026 | 90232C | Projected in-service date | Mar 2026 → Jun 2026 |
| June 1, 2026 | 90232C | Projected in-service date | Jan 2026 → Mar 2026 |
| February 1, 2026 | 90232C | Projected in-service date | Sep 2025 → Jan 2026 |
| October 1, 2025 | 100503B | First listed | on the Future tab |
| October 1, 2025 | 100503C | First listed | on the Future tab |
| October 1, 2025 | 100503D | First listed | on the Future tab |
| October 1, 2025 | 90232C | Projected in-service date | Jul 2025 → Sep 2025 |
| June 1, 2025 | 87479C | Moved between tabs | Future → Current-year planned |
| June 1, 2025 | 90232C | Moved between tabs | Future → Current-year planned |
| February 1, 2025 | 90232C | First listed | on the Future tab |
| October 1, 2024 | 87479C | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.