Lytle

Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Medina County. First named in the release with data as of October 1, 2023.

Medinacounty as printed
138kV
AEP TCC/ETT, ETT/AEP TCC/ETTutility
2projects listed

Expansion at an existing substation: named load connected. The quoted wording describes a named load being connected at this substation. “Interconnect the Cinco II load to the existing Lytle 138 kV station” — project 81659, as the utility reported it

A HIFLD substation record has the same name and county: LYTLE (MEDINA County). The names agree; that does not confirm they are the same facility.

Generation interconnection requests filed in Medina, TX: ERCOT queue, 7 active of 8. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Lytle: Construct New 138 kV Terminal
Convert the Big Foot to Lytle 69 kV line to 138 kV and interconnect Rowan Digital to the Lytle 138 kV station
ERCOT project 76242 · utility no. TP2022155
ETT/AEP TCC/ETT
Tier 4
Under Construction
Future tab
138 Feb 2027 Lytle
Medina County
Lytle
Lytle: Construct New 138 kV Terminal
Interconnect the Cinco II load to the existing Lytle 138 kV station and add capacitors
ERCOT project 81659
AEP TCC/ETT
Tier 4
Conceptual
Future tab
138 Dec 2028 Lytle
Medina County
Lytle

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
October 1, 202676242Moved between tabsCurrent-year planned → Future
October 1, 202676242Projected in-service dateNov 2026 → Feb 2027
June 1, 202676242Status as reportedPlanned → Under Construction
June 1, 202676242Projected in-service dateAug 2026 → Nov 2026
February 1, 202676242Moved between tabsFuture → Current-year planned
October 1, 202576242Projected in-service dateJun 2026 → Aug 2026
October 1, 202581659Projected in-service dateDec 2026 → Dec 2028
February 1, 202576242Projected in-service dateFeb 2026 → Jun 2026
October 1, 202476242Projected in-service dateSep 2025 → Feb 2026
June 1, 202481659First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.