Substation Scout

Drane 345 kV Switch

Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Navarro County. First named in the release with data as of June 1, 2025.

Navarrocounty as printed
345kV
ONCORutility
2projects listed

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Navarro, TX: ERCOT queue, 26 active of 29. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Establish Drane 345 kV Switch
ERCOT project 91457A · utility no. R6410
ONCOR
Tier 4
Planned
Current-year planned tab
345 Dec 2026 Drane 345 kV Switch to Drane 345 kV Switch
Navarro County
Drane 345 kV Switch
Establish Drane 345 kV Switch
Drane 345 kV Switch Gen Tie
ERCOT project 91457B · utility no. R6410
ONCOR
Tier 4
Planned
Future tab
345 Apr 2027 Drane 345 kV Switch to Tormes Solar
Navarro County
Drane 345 kV Switch, Tormes Solar

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
October 1, 202691457AFirst listedon the Current-year planned tab
October 1, 202691457BFirst listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.