Frontera
Named in 4 listed projects in ERCOT’s transmission project tracking workbook, in Hidalgo County. First named in the release with data as of February 1, 2015.
Expansion at an existing substation: new or expanded yard. The quoted wording describes a new or expanded yard, bus, bay or station at this substation. “Expand Frontera Station” — project 66101, as the utility reported it
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Hidalgo, TX: ERCOT queue, 25 active of 31. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Frontera to Key Switch: Rebuild/Re-conductor 138 kV Line Rebuild/Re-conductor the Frontera to Key Switch 138 kV line ERCOT project 103456 · utility no. TP2025872 |
AEP TCC Tier 4 |
Planned Future tab |
138 | Feb 2028 | Frontera to Key Switch Hidalgo County |
Frontera, Key Switch |
| Ad-Hoc TPIT: Arrow - System Upgrades System upgrades to accommodate the full load at Sharyland's Arrow Load Serving station. Includes 345 kV line upgrades for Mantle - Bonilla ERCOT project 110834 |
SLU Tier 1 |
Conceptual Future tab |
345 | May 2031 | Kingfisher to Frontera Cameron / Hidalgo County |
Kingfisher, Frontera |
| Del Sol to Frontera: Build New 345 kV Double Circuit Line Build new 345 kV double circuit line from Del Sol to Frontera. Expand Frontera Station and install two (2) autotransformers. ERCOT project 66101 · utility no. TP2020838 · RPG 21RPG017 |
AEP TCC/ETT Tier 1 |
Planned Current-year planned tab |
345 | Oct 2026 | Del Sol to Frontera Starr / Hidalgo County |
Del Sol, Frontera |
| Frontera: 138 kV Breaker Replacement Replace 138 kV breakers at the Frontera 138 kV station ERCOT project 99794 · utility no. TP2025213 |
AEP TCC Tier 4 |
Planned Future tab |
138 | Nov 2028 | Frontera Hidalgo County |
Frontera |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 66101 | Projected in-service date | Sep 2026 → Oct 2026 |
| October 1, 2026 | 99794 | Projected in-service date | Mar 2028 → Nov 2028 |
| July 13, 2026 | 103456 | Projected in-service date | Mar 2028 → Feb 2028 |
| July 13, 2026 | 110834 | First listed | on the Future tab |
| June 1, 2026 | 103456 | First listed | on the Future tab |
| February 1, 2026 | 66101 | Moved between tabs | Future → Current-year planned |
| October 1, 2025 | 99794 | First listed | on the Future tab |
| February 1, 2025 | 66101 | Projected in-service date | May 2026 → Sep 2026 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.