San Miguel
Named in 5 listed projects in ERCOT’s transmission project tracking workbook, in Atascosa County, plus 1 on its Cancelled tab. First named in the release with data as of February 1, 2015.
A HIFLD substation record has the same name and county: SAN MIGUEL (ATASCOSA County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Atascosa, TX: ERCOT queue, 17 active of 17. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Upgrade Pawnee - San Miguel 138 (5727) PAWNEE SWITCHING STATION to (5902) SAN MIGUEL GEN 138 kV Ckt 1 Rebuild [276 MVA Minimum] ERCOT project 110189 |
STEC Tier 4 |
Conceptual Future tab |
138 | Jan 2031 | Pawnee to San Miguel Karnes / Atascosa County |
Pawnee, San Miguel |
| No title printed ERCOT project 110254 · RPG 26RPG026 · RTP 2025-SC20 |
BEPC Tier 1 |
Planned Future tab |
345 | Apr 2031 | San Miguel to Marion Atascosa / Comal County |
San Miguel, Marion |
| STEC Amphion Load Project Phase 1 -Hairpin San Miguel to Fowlerton ckt 2 into STEC Amphion load serving station -Loop in and out San Miguel to Cruce into STEC Amphion load station ERCOT project 110455 |
STEC Tier 2 |
Conceptual Future tab |
345 | Jan 2030 | San Miguel to Fowlerton, Cruce Atascosa / McMullen County |
San Miguel, Fowlerton, Cruce |
| STEC Amphion Load Project Phase3 -RTP project 2024-CS1: Upgrade Cachena to Old Hickory ckt 2 to 1072MVA -RTP Project 2025-SC20: Upgrade Cachena to Elm Creek ckt 2 to 1965 MVA -RTP Project 2024-SC26: Upgrade Elm Creek to Shaula ckt 1 to 1746 MVA -Upgrade Pawnee to San Miguel 345 to 1810 MVA ERCOT project 110459 |
STEC Tier 2 |
Conceptual Future tab |
345 | Jul 2031 | Pawnee to San Miguel Karnes / Atascosa County |
Pawnee, San Miguel |
| San Miguel to Cruce 345 kV lines New San Miguel to Cruce 345 kV double circuit lines ERCOT project 67329 · RPG 21RPG017 |
STEC Tier 1 |
Planned Future tab |
345 | Jan 2027 | San Miguel to Cruce Atascosa / Duval County |
San Miguel, Cruce |
On the Cancelled tab
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| San Miguel to Sigmor 138 kV line upgrade Upgrade San Miguel to Sigmor 138 kV line as recommended in 2013 RTP. Will investigate re-conductoring on existing structures with ACCC and other high temperature conductors. ERCOT project 3822 · RTP 2013-R102 |
STEC Tier 3 |
Conceptual Cancelled tab |
138 | Jun 2031 | San Miguel to Sigmor Atascosa / Live Oak County |
San Miguel, Sigmor |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 67329 | Moved between tabs | Current-year planned → Future |
| October 1, 2026 | 67329 | Projected in-service date | Dec 2026 → Jan 2027 |
| July 13, 2026 | 110189 | First listed | on the Future tab |
| July 13, 2026 | 110254 | First listed | on the Future tab |
| July 13, 2026 | 110455 | First listed | on the Future tab |
| July 13, 2026 | 110459 | First listed | on the Future tab |
| February 1, 2026 | 67329 | Moved between tabs | Future → Current-year planned |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.