Substation Scout

Crosby

Named in 4 listed projects in ERCOT’s transmission project tracking workbook, in Harris County. First named in the release with data as of February 1, 2015.

Harriscounty as printed
138kV
CNPutility
4projects listed

A HIFLD substation record has the same name and county: CROSBY (HARRIS County). The names agree; that does not confirm they are the same facility.

Generation interconnection requests filed in Harris, TX: ERCOT queue, 30 active of 35 · MISO queue, 0 active of 1. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
This models upgrades required for a proposed load addition
Loop Newsub into ckt.08 between Crosby and Danek. Upgrade substation equipment at Crosby and Danek.
ERCOT project 110219A
CNP
Tier 4
Conceptual
Future tab
138 Jul 2028 Newsub to Crosby/Danek
Harris County
Crosby, Danek
This models upgrades required for a proposed load addition
Rebuild/Reconductor 138kV ckt.66 from Haney to Crosby. Upgrade substation equipment at Haney substation.
ERCOT project 110219B
CNP
Tier 4
Conceptual
Future tab
138 Jul 2028 Haney to Crosby
Harris County
Haney, Crosby
Removal of 140MVAr SVC and facilities from Bellaire and Crosby 138kV substations.
Remove the 140MVAr SVC and facilities from Crosby 138kV substation
ERCOT project 112585B
CNP
Tier 4
Planned
Future tab
138 May 2027 Crosby
Harris County
Crosby
Bohemian (BOH) 138kV CEHE Substation for Destiny Storage (24INR0397)
Install new CEHE 138kV Bohemian (BOH) substation for generator interconnection to Destiny Storage. Loop Ckt.66K into substation to create new Ckt.66 Crosby to Bohemian to Eastgate.
ERCOT project 78427A
CNP
Tier 4
In-Service
Completed tab
138 May 2026
actual 2026-02
Rhapsody to Crosby/ Eastgate
Harris County
Rhapsody, Crosby, Eastgate

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
October 1, 2026112585BFirst listedon the Future tab
July 13, 2026110219AFirst listedon the Future tab
July 13, 2026110219BFirst listedon the Future tab
June 1, 202678427AMoved between tabsCurrent-year planned → Completed
June 1, 202678427AStatus as reportedPlanned → In-Service
February 1, 202678427AMoved between tabsFuture → Current-year planned
October 1, 202578427AMoved between tabsCurrent-year planned → Future
October 1, 202578427AProjected in-service dateOct 2025 → May 2026
June 1, 202578427AMoved between tabsFuture → Current-year planned
October 1, 202478427AProjected in-service dateSep 2025 → Oct 2025
June 1, 202478427AProjected in-service dateSep 2024 → Sep 2025

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.