Substation Scout

Jones Creek

Named in 6 listed projects in ERCOT’s transmission project tracking workbook, in Brazoria County, plus 1 on its Cancelled tab. First named in the release with data as of June 1, 2015.

Brazoriacounty as printed
138, 345kV
CNPutility
6projects listed

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Brazoria, TX: ERCOT queue, 54 active of 63. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
New 138kV Waterfowl substation
Reconfigure existing Ckt.02F (move Seadoc/Seaway onto other circuit) resulting in Ckt.36 COPPER to Booster tap to Jones Creek.
ERCOT project 64581A · RPG 21RPG009
CNP
Tier 3
In-Service
Completed tab
138 May 2026
actual 2026-05
COPPER to Jones Creek
Brazoria County
COPPER, Jones Creek
New 138kV Waterfowl substation
Install new CEHE-owned 138kV Waterfowl (WTR) substation. Reconfigure existing Ckt.02F and install new conductor to create new Ckt.54A Jones Creek to Waterfowl
ERCOT project 64581B · RPG 21RPG009
CNP
Tier 3
In-Service
Completed tab
138 May 2026
actual 2026-05
Jones Creek to Waterfowl
Brazoria County
Jones Creek, Waterfowl
New 138kV Waterfowl substation
Install new CEHE-owned 138kV Waterfowl (WTR) substation. Convert customer-owned Seadoc substation to loop service. Reconfigure existing Ckt.02F and reconnect Seadoc/Seaway to create new Ckt.02F Jones creek to Seadoc loop to Seaway tap to Waterfowl.
ERCOT project 64581C · RPG 21RPG009
CNP
Tier 3
In-Service
Completed tab
138 May 2026
actual 2026-05
Jones Creek to Waterfowl
Brazoria County
Jones Creek, Waterfowl
DURZNO (DUR) 138kV Customer Substation
Install new customer-owned 138kV DURZNO (DUR) substation. Loop into Ckt.54 to create new Ckt.54 Jones Creek to DURZNO to Waterfowl.
ERCOT project 90336
CNP
Tier 4
In-Service
Completed tab
138 May 2026
actual 2026-05
DURAZNO to Jones Creek/ Waterfowl
Brazoria County
DURAZNO, Jones Creek, Waterfowl
Facility Ratings Methodology Phase 2 (FRM2) Upgrades
Upgrade Ckt.18D DOW to Jones Creek to increase thermal limits as part of FRM2 upgrades.
ERCOT project 99453N
CNP
Tier 4
Planned
Future tab
345 May 2027 DOW to Jones Creek
Brazoria County
DOW, Jones Creek
Facility Ratings Methodology Phase 2 (FRM2) Upgrades
Upgrade Ckt.62B Waterhole to Jones Creek to increase thermal limits as part of FRM2 upgrades.
ERCOT project 99453P
CNP
Tier 4
Planned
Current-year planned tab
345 Nov 2026 Waterhole to Jones Creek
Wharton / Brazoria County
Waterhole, Jones Creek

On the Cancelled tab

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Hawkinsville (HAW) CNP-Owned 345kV Substation for Lavaca Bay Solar (23INR0084)
New 345kV Hawkinsville (HAW) substation for generator interconnection to Lavaca Bay Solar. Loop Ckt.27D into substation to create new Ckt.27 Jones Creek to Hawkinsville to Refuge.
ERCOT project 73621A
CNP
Tier 4
Planned
Cancelled tab
345 Nov 2026 Waterhole to BAILEY/Jones Creek
Matagorda / Brazoria County
Waterhole, BAILEY, Jones Creek

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
October 1, 202699453PProjected in-service dateOct 2026 → Nov 2026
June 1, 202664581AMoved between tabsCurrent-year planned → Completed
June 1, 202664581AStatus as reportedPlanned → In-Service
June 1, 202664581BMoved between tabsCurrent-year planned → Completed
June 1, 202664581BStatus as reportedPlanned → In-Service
June 1, 202664581CMoved between tabsCurrent-year planned → Completed
June 1, 202664581CStatus as reportedPlanned → In-Service
June 1, 202673621AMoved between tabsCurrent-year planned → Cancelled
June 1, 202690336Moved between tabsCurrent-year planned → Completed
June 1, 202690336Status as reportedPlanned → In-Service
February 1, 202664581AMoved between tabsFuture → Current-year planned
February 1, 202664581AProjected in-service dateApr 2026 → May 2026
February 1, 202664581BMoved between tabsFuture → Current-year planned
February 1, 202664581BProjected in-service dateApr 2026 → May 2026
February 1, 202664581CMoved between tabsFuture → Current-year planned
February 1, 202664581CProjected in-service dateApr 2026 → May 2026
February 1, 202673621AMoved between tabsFuture → Current-year planned
February 1, 202690336Moved between tabsFuture → Current-year planned
February 1, 202690336Projected in-service dateApr 2026 → May 2026
February 1, 202699453NProjected in-service dateOct 2029 → May 2027
February 1, 202699453PMoved between tabsFuture → Current-year planned
October 1, 202564581AProjected in-service dateJan 2026 → Apr 2026
October 1, 202564581BProjected in-service dateJan 2026 → Apr 2026
October 1, 202564581CProjected in-service dateJan 2026 → Apr 2026
October 1, 202573621AProjected in-service dateOct 2026 → Nov 2026
October 1, 202590336Projected in-service dateMar 2026 → Apr 2026
October 1, 202599453NFirst listedon the Future tab
October 1, 202599453PFirst listedon the Future tab
February 1, 202564581AProjected in-service dateOct 2025 → Jan 2026
February 1, 202564581BProjected in-service dateOct 2025 → Jan 2026
February 1, 202564581CProjected in-service dateOct 2025 → Jan 2026
February 1, 202573621AProjected in-service dateMay 2025 → Oct 2026
February 1, 202590336First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.