Georgetown East
Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Williamson County. First named in the release with data as of October 1, 2015.
Williamsoncounty as printed
138kV
ONCORutility
2projects listed
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Williamson, TX: ERCOT queue, 1 active of 3. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Upgrade the Hutto & Round Rock - Salado 138 kV Line Rebuild and double-circuit the Round Rock Westinghouse - Georgetown East 138 kV Line Section ERCOT project 80546B · utility no. R6203, R6202 · RPG 24RPG018, 25RPG006 · RTP 2023-SC17 |
ONCOR Tier 3 |
Planned Current-year planned tab |
138 | May 2026 | Round Rock Westinghouse Tap to Georgetown East Williamson County |
Round Rock Westinghouse Tap, Georgetown East |
| Upgrade the Hutto & Round Rock - Salado 138 kV Line Rebuild and double-circuit the Georgetown East - Sonterra 138 kV Line Section ERCOT project 80546C · utility no. R6203, R6202 · RPG 24RPG018, 25RPG006 · RTP 2023-SC17 |
ONCOR Tier 3 |
Planned Future tab |
138 | May 2027 | Georgetown East to Sonterra Williamson County |
Georgetown East, Sonterra |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 80546C | Moved between tabs | Current-year planned → Future |
| October 1, 2026 | 80546C | Projected in-service date | Dec 2026 → May 2027 |
| February 1, 2026 | 80546B | Projected in-service date | Dec 2025 → May 2026 |
| February 1, 2026 | 80546C | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 80546C | Projected in-service date | May 2026 → Dec 2026 |
| June 1, 2025 | 80546B | Moved between tabs | Future → Current-year planned |
| October 1, 2024 | 80546B | Projected in-service date | May 2026 → Dec 2025 |
| October 1, 2024 | 80546C | First listed | on the Future tab |
| June 1, 2024 | 80546B | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.