Named in 4 listed projects in ERCOT’s transmission project tracking workbook, in Chambers County, plus 1 on its Cancelled tab. First named in the release with data as of June 1, 2020.
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Chambers, TX: ERCOT queue, 2 active of 3 · MISO queue, 1 active of 3. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Upgrades related to the Baytown Area Load Addition Upgrade Ckt.86 DALTON (to RAOULT) to BRINE to increase thermal limits. ERCOT project 111323B · RTP 26RPG006 |
CNP Tier 3 |
Planned Future tab |
138 | May 2028 | DALTON to BRINE Chambers County |
DALTON, BRINE |
| BRINE Substation Upgrades Upgrade substation equipment at BRINE on Ckt.86H DALTON to BRINE to Mont Belvieu. ERCOT project 76369 |
CNP Tier 4 |
Planned Future tab |
138 | May 2027 | BRINE to DALTON/Mont Belvieu Chambers County |
BRINE, DALTON, Mont Belvieu |
| New load customer interconnection RAOULT connecting on ckt 86 between DALTON and BRINE. New load customer interconnection RAOULT connecting on ckt 86 between DALTON and BRINE. Expect transmission breakers in ring bus configuration for new RAOULT substation. ERCOT project 87640 |
CNP Tier 4 |
In-Service Completed tab |
138 | May 2026 actual 2026-04 |
RAOULT to DALTON/ BRINE Chambers County |
RAOULT, DALTON, BRINE |
| Jordan / Mont Belvieu Area Improvement Project Upgrade Ckt.86H BRINE to Mont Belvieu to increase thermal limits. ERCOT project 90255D · RPG 24RPG026 |
CNP Tier 3 |
Planned Future tab |
138 | Apr 2028 | BRINE to Mont Belvieu Chambers County |
BRINE, Mont Belvieu |
On the Cancelled tab
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Upgrades related to the Baytown Area Load Addition Upgrade Ckt.86 DALTON (to RAOULT) to BRINE to increase thermal limits. ERCOT project 102546B · RTP 24RPG028 |
CNP Tier 1 |
Conceptual Cancelled tab |
138 | May 2028 | DALTON to BRINE Chambers County |
DALTON, BRINE |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 102546B | Moved between tabs | Future → Cancelled |
| October 1, 2026 | 102546B | Status as reported | Planned → Conceptual |
| October 1, 2026 | 111323B | First listed | on the Future tab |
| October 1, 2026 | 90255D | Projected in-service date | Mar 2028 → Apr 2028 |
| July 13, 2026 | 90255D | Projected in-service date | Jun 2027 → Mar 2028 |
| July 13, 2026 | 90255D | Projected in-service date | May 2027 → Jun 2027 |
| June 1, 2026 | 102546B | First listed | on the Future tab |
| June 1, 2026 | 87640 | Moved between tabs | Current-year planned → Completed |
| June 1, 2026 | 87640 | Status as reported | Planned → In-Service |
| February 1, 2026 | 87640 | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 87640 | Projected in-service date | Apr 2026 → May 2026 |
| October 1, 2025 | 76369 | Moved between tabs | Completed → Future |
| October 1, 2025 | 76369 | Projected in-service date | Feb 2025 → May 2027 |
| October 1, 2025 | 87640 | Projected in-service date | Feb 2026 → Apr 2026 |
| June 1, 2025 | 76369 | Projected in-service date | Jan 2025 → Feb 2025 |
| June 1, 2025 | 87640 | Projected in-service date | Jan 2026 → Feb 2026 |
| February 1, 2025 | 76369 | Projected in-service date | Sep 2024 → Jan 2025 |
| February 1, 2025 | 90255D | First listed | on the Future tab |
| October 1, 2024 | 76369 | Moved between tabs | Future → Completed |
| October 1, 2024 | 87640 | First listed | on the Future tab |
| June 1, 2024 | 76369 | Moved between tabs | Completed → Future |
| June 1, 2024 | 76369 | Projected in-service date | Jan 2024 → Sep 2024 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.