Stainback 345 kV Switch
Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Dallas County. First named in the release with data as of June 1, 2025.
Dallascounty as printed
345kV
ONCORutility
3projects listed
Also printed as: Stainback Switch
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Dallas, TX: ERCOT queue, 9 active of 11. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Watermill Switch – Stainback Switch 345kV Double-Circuit Line Upgrade Upgrade Watermill Switch – Stainback Switch 345kV Double-Circuit Line Upgrade ERCOT project 105332 · utility no. M4432 · RPG 25RPG004 |
ONCOR Tier 1 |
Planned Future tab |
345 | Dec 2027 | Watermill Switch to Stainback Switch Dallas County |
Watermill Switch, Stainback Switch |
| Stainback 345 kV Capacitor Bank ERCOT project 111207 · utility no. M5017 |
ONCOR Tier 4 |
Planned Future tab |
345 | Dec 2027 | Stainback 345 kV Switch Dallas County |
Stainback 345 kV Switch |
| Stainback 345 kV Switch Establish Stainback 345 kV Switch ERCOT project 92680 · utility no. M4383 |
ONCOR Tier 4 |
In-Service Completed tab |
345 | May 2026 actual 2026-05 |
Stainback 345 kV Switch Dallas County |
Stainback 345 kV Switch |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 111207 | First listed | on the Future tab |
| October 1, 2026 | 92680 | Moved between tabs | Current-year planned → Completed |
| October 1, 2026 | 92680 | Status as reported | Planned → In-Service |
| June 1, 2026 | 105332 | First listed | on the Future tab |
| February 1, 2026 | 92680 | Moved between tabs | Future → Current-year planned |
| June 1, 2025 | 92680 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.