Killeen
Named in 4 listed projects in ERCOT’s transmission project tracking workbook, in Bell County. First named in the release with data as of October 1, 2024.
A HIFLD substation record has the same name and county: KILLEEN (BELL County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Bell, TX: ERCOT queue, 14 active of 14. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Upgrade Killeen Switch - Salado Switch 345 kV Line Ckt #1 ERCOT project 109892 · utility no. R6567 |
ONCOR Tier 3 |
Conceptual Future tab |
345 | Dec 2031 | Killeen to Salado Bell County |
Killeen, Salado |
| Belton - Killeen 138 kV Line via Belton Southwest Upgrade Belton - Killeen 138 kV Line via Belton Southwest ERCOT project 87699 · utility no. R902 · RPG 24RPG001 · RTP 2023-NC36 |
ONCOR Tier 1 |
Planned Future tab |
138 | Dec 2028 | Belton to Killeen Bell County |
Belton, Killeen |
| Belton - Killeen 138 kV Line via Nolanville Reconductor the Belton - Killeen 138 kV Line via Nolanville ERCOT project 87703 · utility no. R6347 · RPG 24RPG001 · RTP 2023-NC22, 2023-NC36, 2023-NC50 |
ONCOR Tier 1 |
Planned Future tab |
138 | Dec 2028 | Belton to Killeen Bell County |
Belton, Killeen |
| Watercrest - Killeen 138 kV Line Upgrade the Watercrest - Killeen 138 kV Line ERCOT project 87711 · utility no. R6355 · RPG 24RPG001 |
ONCOR Tier 1 |
Planned Future tab |
138 | Dec 2028 | Watercrest to Killeen Bell County |
Watercrest, Killeen |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 109892 | Status as reported | Planned → Conceptual |
| July 13, 2026 | 109892 | Projected in-service date | Dec 2032 → Dec 2031 |
| July 13, 2026 | 109892 | First listed | on the Future tab |
| February 1, 2026 | 87699 | Projected in-service date | Dec 2027 → Dec 2028 |
| October 1, 2024 | 87699 | First listed | on the Future tab |
| October 1, 2024 | 87703 | First listed | on the Future tab |
| October 1, 2024 | 87711 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.