Substation Scout

Jacaranda

Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Taylor County. First named in the release with data as of July 13, 2026.

Taylorcounty as printed
345kV
AEP TNCutility
3projects listed

Described as new. The quoted wording calls this substation new. “Jacaranda: Construct New 345 kV Station” — project 109735 title, as the utility reported it

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Taylor, TX: ERCOT queue, 13 active of 15. Same county, not the same substation.

Location

Taylor County, TX

County only. A source prints the county; no point is published. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

How it was located: No point. TPIT names no existing line for Jacaranda; it adds two new 345 kV lines to Mulberry Creek (AEP, OSM way 171734088, 32.5241,-99.8225) and two to Oncor's Paulownia (not located). No public document found draws or describes the site.

Sources: ERCOT TPIT, project(s) 109735, 109737, 111346 (release 39, 2026-10-01) · OpenStreetMap: Mulberry Creek Substation (way 171734088) (OSM extract 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Jacaranda: Construct New 345 kV Station
Interconnect the Lancium load to the new Jacaranda 345 kV station and install two autotransformers
ERCOT project 109735 · utility no. TP2026088
AEP TNC
Tier 4
Planned
Future tab
345 Apr 2029 Jacaranda
Taylor County
Jacaranda
Jacaranda to Mulberry Creek: Construct two new 345 kV lines
Construct two new 345 kV lines between Jacaranda and Mulberry Creek
ERCOT project 109737 · utility no. TP2026088
AEP TNC
Tier 4
Planned
Future tab
345 Apr 2029 Jacaranda to Mulberry Creek
Taylor County
Jacaranda, Mulberry Creek
Jacaranda to Paulownia (Oncor): Construct two new 345 kV lines
Construct two new 345 kV lines between Jacaranda and Paulownia (Oncor)
ERCOT project 111346 · utility no. TP2026088
AEP TNC
Tier 4
Planned
Future tab
345 Apr 2029 Jacaranda to Paulownia
Taylor County
Jacaranda, Paulownia

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
October 1, 2026111346First listedon the Future tab
July 13, 2026109735First listedon the Future tab
July 13, 2026109737First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.