Jacaranda
Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Taylor County. First named in the release with data as of July 13, 2026.
Described as new. The quoted wording calls this substation new. “Jacaranda: Construct New 345 kV Station” — project 109735 title, as the utility reported it
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Taylor, TX: ERCOT queue, 13 active of 15. Same county, not the same substation.
Location
Taylor County, TX
County only. A source prints the county; no point is published. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: No point. TPIT names no existing line for Jacaranda; it adds two new 345 kV lines to Mulberry Creek (AEP, OSM way 171734088, 32.5241,-99.8225) and two to Oncor's Paulownia (not located). No public document found draws or describes the site.
Sources: ERCOT TPIT, project(s) 109735, 109737, 111346 (release 39, 2026-10-01) · OpenStreetMap: Mulberry Creek Substation (way 171734088) (OSM extract 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Jacaranda: Construct New 345 kV Station Interconnect the Lancium load to the new Jacaranda 345 kV station and install two autotransformers ERCOT project 109735 · utility no. TP2026088 |
AEP TNC Tier 4 |
Planned Future tab |
345 | Apr 2029 | Jacaranda Taylor County |
Jacaranda |
| Jacaranda to Mulberry Creek: Construct two new 345 kV lines Construct two new 345 kV lines between Jacaranda and Mulberry Creek ERCOT project 109737 · utility no. TP2026088 |
AEP TNC Tier 4 |
Planned Future tab |
345 | Apr 2029 | Jacaranda to Mulberry Creek Taylor County |
Jacaranda, Mulberry Creek |
| Jacaranda to Paulownia (Oncor): Construct two new 345 kV lines Construct two new 345 kV lines between Jacaranda and Paulownia (Oncor) ERCOT project 111346 · utility no. TP2026088 |
AEP TNC Tier 4 |
Planned Future tab |
345 | Apr 2029 | Jacaranda to Paulownia Taylor County |
Jacaranda, Paulownia |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 111346 | First listed | on the Future tab |
| July 13, 2026 | 109735 | First listed | on the Future tab |
| July 13, 2026 | 109737 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.