Katy
Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Waller County. First named in the release with data as of February 1, 2015.
Expansion at an existing substation: new or expanded yard. The quoted wording describes a new or expanded yard, bus, bay or station at this substation. “Expand Katy Substation” — project 109599, as the utility reported it
A HIFLD substation record has the same name and county: KATY (WALLER County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Waller, TX: ERCOT queue, 5 active of 6. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Hockley Distribution Transformer Addition with Upgrades Upgrade Ckt.66A Flewellen to Katy tap to increase thermal limits ERCOT project 104559B |
CNP Tier 4 |
Planned Future tab |
138 | Dec 2027 | Flewellen to Katy Fort Bend / Waller County |
Flewellen, Katy |
| Expand Katy Substation Ckt.09H for 4th Distribution Transformer. ERCOT project 109599 |
CNP Tier 4 |
Planned Future tab |
138 | Mar 2027 | Katy Waller County |
Katy |
| Install Morton 138/35kV Distribution Substation with double-tap service. Install Morton 138/35kV Distribution Substation with double-tap service. Tap Ckt.09H to create new Ckt.09H Katy to Morton to Franz ERCOT project 110075A |
CNP Tier 4 |
Planned Future tab |
138 | May 2028 | Morton to Katy /Franz Harris / Waller County |
Morton, Katy, Franz |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 110075A | First listed | on the Future tab |
| July 13, 2026 | 109599 | First listed | on the Future tab |
| June 1, 2026 | 104559B | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.