WARVUE
Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Chambers County, plus 1 on its Cancelled tab. First named in the release with data as of October 1, 2018.
A HIFLD substation record has the same name and county: WARVUE (CHAMBERS County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Chambers, TX: ERCOT queue, 2 active of 3 · MISO queue, 1 active of 3. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Upgrades related to the Baytown Area Load Addition Upgrade Ckt.84K HOPSON to WARVUE to increase thermal limits. ERCOT project 111323A · RTP 26RPG006 |
CNP Tier 3 |
Planned Future tab |
138 | May 2028 | HOPSON to WARVUE Chambers County |
HOPSON, WARVUE |
| Cedar Bayou 5 Generator Interconnection (23INR0029) Upgrade Ckt.84K HOPSON to WARVUE to increase thermal limits. ERCOT project 90173C |
CNP Tier 4 |
Planned Future tab |
138 | Jun 2027 | HOPSON to WARVUE Chambers County |
HOPSON, WARVUE |
| Jordan / Mont Belvieu Area Improvement Project Install 120 MVAr cap bank at Mont Belvieu Ckt.84E to WARVUE. ERCOT project 90255A · RPG 24RPG026 |
CNP Tier 3 |
Planned Future tab |
138 | May 2027 | Mont Belvieu to WARVUE Chambers County |
Mont Belvieu, WARVUE |
On the Cancelled tab
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Upgrades related to the Baytown Area Load Addition Upgrade Ckt.84K HOPSON to WARVUE to increase thermal limits. ERCOT project 102546A · RTP 24RPG028 |
CNP Tier 1 |
Conceptual Cancelled tab |
138 | May 2028 | HOPSON to WARVUE Chambers County |
HOPSON, WARVUE |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 102546A | Moved between tabs | Future → Cancelled |
| October 1, 2026 | 102546A | Status as reported | Planned → Conceptual |
| October 1, 2026 | 111323A | First listed | on the Future tab |
| June 1, 2026 | 102546A | First listed | on the Future tab |
| February 1, 2025 | 90173C | First listed | on the Future tab |
| February 1, 2025 | 90255A | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.