Venus Switch
Named in 6 listed projects in ERCOT’s transmission project tracking workbook, in Ellis County, plus 1 on its Cancelled tab. First named in the release with data as of February 1, 2015.
Also printed as: Venus · Venus Substation
A HIFLD substation record has the same name and county: VENUS (ELLIS County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Ellis, TX: ERCOT queue, 26 active of 30. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Venus – Old Country Switch 345 kV Double-Circuit Line Upgrade Venus – Old Country Switch 345 kV Double-Circuit Line ERCOT project 109818 · utility no. M4282 · RPG 25RPG040 · RTP 2024-NC56 |
ONCOR Tier 1 |
Planned Future tab |
345 | Apr 2030 | Venus Switch to Old Country Switch Ellis County |
Venus Switch, Old Country Switch |
| Oncor_ME_109845_Cleburne Switch - Venus 138 kV Line Section and Rebuild Cleburne 138 kV Switch Upgrade Cleburne Switch - Venus 138 kV Line Section and Rebuild Cleburne 138 kV Switch ERCOT project 109845 · utility no. M5371, M5196 · RPG 25RPG040 · RTP 2024-NC04 |
ONCOR Tier 1 |
Planned Future tab |
138 | Dec 2028 | Venus Substation to Cleburne Switch Ellis / Johnson County |
Venus Substation, Cleburne Switch |
| Venus Switch - Britton Road 345 kV Line Section Upgrade ERCOT project 110597 · utility no. M5373 |
ONCOR Tier 3 |
Conceptual Future tab |
345 | Dec 2031 | Venus Switch to Britton Road Ellis / Johnson County |
Venus Switch, Britton Road |
| Venus 345 kV Switch Terminal Equipment Upgrade Venus 345 kV Switch Terminal Equipment ERCOT project 110608 · utility no. M5374 |
ONCOR Tier 3 |
Conceptual Future tab |
345 | Dec 2029 | Venus Switch Ellis County |
Venus Switch |
| Venus Switch - Timberview Switch 345 kV Line Upgrade ERCOT project 110629 · utility no. M5375 |
ONCOR Tier 3 |
Conceptual Future tab |
345 | Dec 2031 | Venus Switch to Timberview Switch Ellis / Tarrant County |
Venus Switch, Timberview Switch |
| Rebuild Sam Switch - Venus Switch 345 kV DCKT ERCOT project 78369 · utility no. R6293 · RPG 24RPG017 |
ONCOR Tier 1 |
Planned Future tab |
345 | May 2027 | Venus to Sam Ellis / Hill County |
Venus, Sam |
On the Cancelled tab
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Venus - Chaparral Steel Tap 138 kV Line Upgrade existing line ERCOT project 16TPIT0068 · utility no. M4113-E · RTP 2013-R50 |
ONCOR Tier 4 |
Conceptual Cancelled tab |
138 | May 2026 | Venus to Chaparral Steel Tap Ellis County |
Venus, Chaparral Steel Tap |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 109845 | Projected in-service date | Dec 2029 → Dec 2028 |
| July 13, 2026 | 109818 | First listed | on the Future tab |
| July 13, 2026 | 109845 | First listed | on the Future tab |
| July 13, 2026 | 110597 | First listed | on the Future tab |
| July 13, 2026 | 110608 | First listed | on the Future tab |
| July 13, 2026 | 110629 | First listed | on the Future tab |
| October 1, 2025 | 78369 | Projected in-service date | May 2026 → May 2027 |
| October 1, 2024 | 16TPIT0068 | First listed | on the Cancelled tab |
| October 1, 2024 | 78369 | Projected in-service date | Dec 2025 → May 2026 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.