Big Foot
Named in 1 listed project in ERCOT’s transmission project tracking workbook, in Medina County. First named in the release with data as of May 12, 2023.
No HIFLD substation record has this name in this county (a record of the same name exists in another county).
Generation interconnection requests filed in Medina, TX: ERCOT queue, 7 active of 8. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Big Foot to Lytle: Convert to 138 kV Convert the Big Foot to Lytle 69 kV line to 138 kV and interconnect Rowan Digital to the Lytle 138 kV station ERCOT project 73063 · utility no. TP2022155 |
AEP TCC Tier 4 |
Under Construction Future tab |
138 | Feb 2027 | Big Foot to Lytle Medina / Frio County |
Big Foot, Lytle |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 73063 | Moved between tabs | Current-year planned → Future |
| October 1, 2026 | 73063 | Projected in-service date | Nov 2026 → Feb 2027 |
| June 1, 2026 | 73063 | Status as reported | Planned → Under Construction |
| June 1, 2026 | 73063 | Projected in-service date | Aug 2026 → Nov 2026 |
| February 1, 2026 | 73063 | Moved between tabs | Future → Current-year planned |
| October 1, 2025 | 73063 | Projected in-service date | Jun 2026 → Aug 2026 |
| February 1, 2025 | 73063 | Projected in-service date | Feb 2026 → Jun 2026 |
| October 1, 2024 | 73063 | Projected in-service date | Sep 2025 → Feb 2026 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.