PH Robinson
Named in 3 listed projects in ERCOT’s transmission project tracking workbook, plus 1 on its Cancelled tab. First named in the release with data as of October 1, 2025.
—county as printed
138kV
CNPutility
3projects listed
No HIFLD substation record has this name in this county.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Webster Distribution Upgrades Remove existing Webster TR3 tap from Ckt.35A Polaris to PH Robinson. Reconfigure tap section and reconnect to another circuit. ERCOT project 100503A |
CNP Tier 4 |
Planned Future tab |
138 | May 2027 | Polaris to PH Robinson Harris County |
Polaris, PH Robinson |
| Webster Distribution Upgrades Disconnect Webster TR2 from Ckt.92A service and reconnect as Ckt.93A PH Robinson to Webster TR1/TR2 to Webster main bus. ERCOT project 100503C |
CNP Tier 4 |
Planned Future tab |
138 | May 2027 | Webster to PH Robinson /Webster Harris County |
Webster, PH Robinson |
| Upgrades related to the Baytown Area Load Addition Upgrade Ckt.79F PH Robinson to Seabrook to HANNA to HUNTER in order to increase thermal limits. ERCOT project 111323G · RTP 26RPG006 |
CNP Tier 3 |
Planned Future tab |
138 | May 2028 | PH Robinson to HUNTER | PH Robinson, HUNTER |
On the Cancelled tab
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Upgrades related to the Baytown Area Load Addition Upgrade Ckt.79F PH Robinson to Seabrook to HANNA to HUNTER in order to increase thermal limits. ERCOT project 102546G · RTP 24RPG028 |
CNP Tier 1 |
Conceptual Cancelled tab |
138 | May 2028 | PH Robinson to HUNTER | PH Robinson, HUNTER |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 102546G | Moved between tabs | Future → Cancelled |
| October 1, 2026 | 102546G | Status as reported | Planned → Conceptual |
| October 1, 2026 | 111323G | First listed | on the Future tab |
| June 1, 2026 | 102546G | First listed | on the Future tab |
| October 1, 2025 | 100503A | First listed | on the Future tab |
| October 1, 2025 | 100503C | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.
Site Scanner