Raider

Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Wharton County. First named in the release with data as of July 13, 2026.

Whartoncounty as printed
138, 345kV
CNPutility
3projects listed

Described as new. The quoted wording calls this substation new. “new CEHE Raider Substation” — project 110068A title, as the utility reported it

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Wharton, TX: ERCOT queue, 42 active of 44. Same county, not the same substation.

Location

Wharton County, TX

County only. A source prints the county; no point is published. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

Sources: ERCOT Transmission Project and Information Tracking (TPIT) workbook, project(s) 110068A, 110068B, 109643 (release 2026-10-01). Researched by Substation Scout; checked November 21, 2026.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Install temporary tap service on Ckt.60C to create new Ckt.60C South Lane City to Raider tap to New Gulf.
ERCOT project 109643
CNP
Tier 4
Planned
Current-year planned tab
138 Nov 2026 Raider to South Lane City / New Gulf
Wharton County
Raider, South Lane City, New Gulf
This models the new CEHE Raider Substation and upgrades required for a proposed load addition
Install new 345kV CEHE Raider substation. Loop 345 kV Ckt. 72 Bailey-Cedar Creek line into the new 345 kV Raider substation. Upgrade line relaying on Ckt 72 Cedar Creek-Raider-Bailey. Remove temporary 138 kV service.
ERCOT project 110068A
CNP
Tier 4
Planned
Future tab
345 May 2027 Raider to Cedar Creek/Bailey
Wharton County
Raider, Cedar Creek, Bailey
This models the new CEHE Raider Substation and upgrades required for a proposed load addition
Loop 345 kV Ckt. 64 Wolf-Hillje line into the new 345 kV CEHE Raider substation. Upgrade line relaying on Ckt 64 WOLF-Raider-Hillje.
ERCOT project 110068B
CNP
Tier 4
Planned
Future tab
345 May 2029 Raider to Wolf/Hillje
Wharton County
Raider, Wolf, Hillje

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
October 1, 2026110068AMoved between tabsCurrent-year planned → Future
October 1, 2026110068AStatus as reportedConceptual → Planned
October 1, 2026110068AProjected in-service dateOct 2026 → May 2027
October 1, 2026110068BStatus as reportedConceptual → Planned
October 1, 2026110068BProjected in-service dateOct 2028 → May 2029
July 13, 2026109643First listedon the Current-year planned tab
July 13, 2026110068AFirst listedon the Current-year planned tab
July 13, 2026110068BFirst listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.