Long Draw
Named in 4 listed projects in ERCOT’s transmission project tracking workbook, in Borden County. First named in the release with data as of February 1, 2015.
Bordencounty as printed
345kV
ONCOR, WETTutility
4projects listed
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Borden, TX: ERCOT queue, 17 active of 19 · SPP queue, 0 active of 1. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Farmland 345 kV Switch Rebuild and Farmland - Long Draw 345 kV Line Rebuild the existing 22.8-mile Farmland - Long Draw 345 kV Line and terminate the circuit into the newly rebuilt Farmland 345 kV Switch and WETT's existing Long Draw 345 kV Switch ERCOT project 110521 · utility no. R8786 |
ONCOR Tier 3 |
Conceptual Future tab |
345 | Dec 2029 | Farmland to Long Draw Lynn / Borden County |
Farmland, Long Draw |
| Ad Hoc TPIT: 345 kV Second Circuit from Long Draw to Venturi to Volta to Grelton to Oncor's ODESEHV2_5 station ERCOT project 110575 |
WETT Tier 3 |
Conceptual Future tab |
345 | Apr 2028 | Long Draw 345 kV to Oncor's ODESEHV2_5 345 kV station Borden / Ector County |
Long Draw |
| WETT Buck Canyon 345 kV Station for Synchronous Condensers ERCOT project 112691 · RPG 24RPG041 |
WETT Tier 3 |
Under Construction Future tab |
345 | Mar 2027 | Long Draw to Buck Canyon Borden County |
Long Draw, Buck Canyon |
| Tier 3 project to add second autotransformer at Long Draw ERCOT project 90964 · RPG 24RPG027 |
WETT Tier 3 |
Planned Current-year planned tab |
345 | Oct 2026 | Long Draw 345 kV to Long Draw 138 kV Borden County |
Long Draw |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 112691 | First listed | on the Future tab |
| July 13, 2026 | 110521 | First listed | on the Future tab |
| July 13, 2026 | 110575 | First listed | on the Future tab |
| June 1, 2026 | 90964 | Projected in-service date | Mar 2026 → Oct 2026 |
| February 1, 2026 | 90964 | Moved between tabs | Future → Current-year planned |
| June 1, 2025 | 90964 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.