Substation Scout

Long Draw

Named in 4 listed projects in ERCOT’s transmission project tracking workbook, in Borden County. First named in the release with data as of February 1, 2015.

Bordencounty as printed
345kV
ONCOR, WETTutility
4projects listed

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Borden, TX: ERCOT queue, 17 active of 19 · SPP queue, 0 active of 1. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Farmland 345 kV Switch Rebuild and Farmland - Long Draw 345 kV Line
Rebuild the existing 22.8-mile Farmland - Long Draw 345 kV Line and terminate the circuit into the newly rebuilt Farmland 345 kV Switch and WETT's existing Long Draw 345 kV Switch
ERCOT project 110521 · utility no. R8786
ONCOR
Tier 3
Conceptual
Future tab
345 Dec 2029 Farmland to Long Draw
Lynn / Borden County
Farmland, Long Draw
Ad Hoc TPIT: 345 kV Second Circuit from Long Draw to Venturi to Volta to Grelton to Oncor's ODESEHV2_5 station
ERCOT project 110575
WETT
Tier 3
Conceptual
Future tab
345 Apr 2028 Long Draw 345 kV to Oncor's ODESEHV2_5 345 kV station
Borden / Ector County
Long Draw
WETT Buck Canyon 345 kV Station for Synchronous Condensers
ERCOT project 112691 · RPG 24RPG041
WETT
Tier 3
Under Construction
Future tab
345 Mar 2027 Long Draw to Buck Canyon
Borden County
Long Draw, Buck Canyon
Tier 3 project to add second autotransformer at Long Draw
ERCOT project 90964 · RPG 24RPG027
WETT
Tier 3
Planned
Current-year planned tab
345 Oct 2026 Long Draw 345 kV to Long Draw 138 kV
Borden County
Long Draw

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
October 1, 2026112691First listedon the Future tab
July 13, 2026110521First listedon the Future tab
July 13, 2026110575First listedon the Future tab
June 1, 202690964Projected in-service dateMar 2026 → Oct 2026
February 1, 202690964Moved between tabsFuture → Current-year planned
June 1, 202590964First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.