Named in 7 listed projects in ERCOT’s transmission project tracking workbook, in Jones County. First named in the release with data as of February 1, 2017.
Expansion at an existing substation: named load connected. The quoted wording describes a named load being connected at this substation. “Interconnect the Lancium load to the Mulberry Creek 345 kV station” — project 77122, as the utility reported it
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Jones, TX: ERCOT queue, 18 active of 21. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Mulberry Creek: Rebuild 345 kV station Rebuild Mulberry Creek 345 kV station and replace both autotransformers ERCOT project 48816 · utility no. 2776 · RPG 21RPG021 |
AEP TNC Tier 4 |
Under Construction Completed tab |
345 | Jun 2025 actual 2025-06 |
Mulberry Creek Jones County |
Mulberry Creek |
| Rebuild and reconfigure the existing Mulberry Creek 345 kV Switch ERCOT project 66569 · utility no. R9022 · RPG 21RPG021 |
ONCOR Tier 3 |
Planned Completed tab |
345 | May 2025 actual 2025-05 |
Mulberry Creek to Mulberry Creek Jones County |
Mulberry Creek |
| Mulberry Creek: Rebuild 138 kV Station Rebuild Mulberry Creek 138 kV station ERCOT project 73032 · RPG 25RPG034 |
AEP TNC Tier 4 |
Planned Future tab |
138 | Nov 2027 | Mulberry Creek Jones County |
Mulberry Creek |
| Mulberry Creek: Construct New 345 kV Terminal Interconnect the Lancium load to the Mulberry Creek 345 kV station ERCOT project 77122 |
AEP TNC Tier 4 |
Planned Completed tab |
345 | Nov 2025 actual 2025-12 |
Mulberry Creek Jones County |
Mulberry Creek |
| Elm Creek to Mulberry Creek: Rebuild 138 kV Line Rebuild the Elm Creek to Mulberry Creek 138 kV line ERCOT project 90063 · utility no. TP2023600 |
AEP TNC Tier 4 |
Planned Future tab |
138 | May 2027 | Elm Creek to Mulberry Creek Taylor / Jones County |
Elm Creek, Mulberry Creek |
| Abilene Northwest to Mulberry Creek: Rebuild 138 kV Line Rebuild the Abilene Northwest to Mulberry Creek 138 kV line ERCOT project 90065 · utility no. TP2023881 |
AEP TNC Tier 4 |
Planned Future tab |
138 | Jan 2027 | Abilene Northwest to Mulberry Creek Taylor / Jones County |
Abilene Northwest, Mulberry Creek |
| Bluff Creek to Mulberry Creek: Rebuild 345 kV Line as a Double Circuit Rebuild existing 345 kV line from Bluff Creek to Mulberry Creek as a double circuit line ERCOT project 98599 · RPG H.B. 5066 |
AEP TNC Tier 1 |
Planned Future tab |
345 | Dec 2028 | Bluff Creek to Mulberry Creek Taylor / Jones County |
Bluff Creek, Mulberry Creek |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 73032 | Projected in-service date | Feb 2027 → Nov 2027 |
| October 1, 2026 | 90065 | Moved between tabs | Current-year planned → Future |
| October 1, 2026 | 90065 | Projected in-service date | Nov 2026 → Jan 2027 |
| June 1, 2026 | 73032 | Projected in-service date | Apr 2027 → Feb 2027 |
| June 1, 2026 | 98599 | Projected in-service date | Nov 2030 → Dec 2028 |
| February 1, 2026 | 48816 | Moved between tabs | Current-year planned → Completed |
| February 1, 2026 | 77122 | Moved between tabs | Current-year planned → Completed |
| February 1, 2026 | 90065 | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 90065 | Projected in-service date | May 2027 → Nov 2026 |
| October 1, 2025 | 48816 | Projected in-service date | May 2025 → Jun 2025 |
| October 1, 2025 | 66569 | Moved between tabs | Current-year planned → Completed |
| October 1, 2025 | 98599 | First listed | on the Future tab |
| June 1, 2025 | 48816 | Moved between tabs | Future → Current-year planned |
| June 1, 2025 | 66569 | Moved between tabs | Future → Current-year planned |
| June 1, 2025 | 77122 | Moved between tabs | Future → Current-year planned |
| June 1, 2025 | 77122 | Projected in-service date | Sep 2025 → Nov 2025 |
| February 1, 2025 | 77122 | Projected in-service date | Apr 2026 → Sep 2025 |
| February 1, 2025 | 90063 | First listed | on the Future tab |
| February 1, 2025 | 90065 | First listed | on the Future tab |
| October 1, 2024 | 73032 | Projected in-service date | Apr 2026 → Apr 2027 |
| June 1, 2024 | 48816 | Status as reported | Planned → Under Construction |
| June 1, 2024 | 73032 | Projected in-service date | Nov 2025 → Apr 2026 |
| June 1, 2024 | 77122 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.