Jewett
Named in 6 listed projects in ERCOT’s transmission project tracking workbook, in Leon County. First named in the release with data as of February 1, 2015.
Also printed as: Jewett Switch
A HIFLD substation record has the same name and county: JEWETT (LEON County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Leon, TX: ERCOT queue, 13 active of 14. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Install Jewett Switch - Crockett Switch 138 kV Line Ckt #2 ERCOT project 110000 · utility no. R6554 |
ONCOR Tier 1 |
Conceptual Future tab |
138 | May 2030 | Jewett Switch to Crockett Switch Leon / Houston County |
Jewett Switch, Crockett Switch |
| Jewett Switch - Greene Switch 345 kV Double-Circuit Line Establish Jewett Switch - Greene Switch 345 kV Double-Circuit Line ERCOT project 110381 · utility no. M4428 · RPG 25RPG042 · RTP 2024-NC63 |
ONCOR Tier 1 |
Planned Future tab |
345 | May 2033 | Greene Switch to Jewett Switch Dallas / Leon County |
Greene Switch, Jewett Switch |
| Newby (NBY) CEHE-Owned 345 kV Substation for DEWEY (DWY) / Jewett Energy Center (29INR0150) Loop new Newby (NBY) 345kV CEHE Substation into Ckt.74 to create new Ckt.74 Jewett to Newby to Limestone. Install (1) 6-Ohm reactor at Newby substation in-series with Ckt.74 Newby to Limestone. ERCOT project 111258A |
CNP Tier 4 |
Planned Future tab |
345 | Oct 2028 | Newby to Jewett / Limestone Freestone / Leon County |
Newby, Jewett, Limestone |
| Newby (NBY) CEHE-Owned 345 kV Substation for DEWEY (DWY) / Jewett Energy Center (29INR0150) Loop new Newby (NBY) 345kV CEHE Substation into Ckt.98 to create new Ckt.98 Limestone to Newby to Jewett. Install (1) 6-Ohm reactor at Newby substation in-series with Ckt.98 Newby to Limestone. ERCOT project 111258B |
CNP Tier 4 |
Planned Future tab |
345 | Oct 2028 | Newby to Limestone / Jewett Freestone / Leon County |
Newby, Limestone, Jewett |
| Install new Skains (SKA) 345kV Substation for generator interconnection to Hollow Branch Creek Solar (24INR0422) Install new Skains (SKA) 345kV Substation for generator interconnection to Hollow Branch Creek Solar (24INR0422). Loop into existing Ckt.74 Singleton to Jewett (ONCOR) to create new Ckt.74 Singleton to Skains to Jewett. ERCOT project 89939A |
CNP Tier 4 |
Planned Future tab |
345 | Oct 2027 | Skains to Singleton/Jewett Grimes / Leon County |
Skains, Singleton, Jewett |
| Rebuild Pin Oak Switch - Jewett Switch 345 kV Double Circuit Line ERCOT project 99620 · utility no. R1704 · RPG 25RPG004 |
ONCOR Tier 1 |
Planned Future tab |
345 | Dec 2028 | Pin Oak Switch to Jewett Switch Freestone / Leon County |
Pin Oak Switch, Jewett Switch |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 110000 | Status as reported | Planned → Conceptual |
| October 1, 2026 | 110381 | First listed | on the Future tab |
| October 1, 2026 | 111258A | First listed | on the Future tab |
| October 1, 2026 | 111258B | First listed | on the Future tab |
| July 13, 2026 | 110000 | First listed | on the Future tab |
| June 1, 2026 | 99620 | First listed | on the Future tab |
| February 1, 2025 | 89939A | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.