Sand Lake
Named in 8 listed projects in ERCOT’s transmission project tracking workbook, in Ward County. First named in the release with data as of June 1, 2018.
Wardcounty as printed
345, 765kV
LCRATSC, ONCOR, ONCOR/LCRA TSCutility
8projects listed
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Ward, TX: ERCOT queue, 12 active of 13. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Sand Lake - Big Hill (LCRA) 765 kV Line Add Permian Basin Reliability Plan Upgrade ID 765_Import_2E. Add a new Big Hill – Sand Lake 765-kV single-circuit line ERCOT project 100597 · utility no. PB_765_Import2_E |
ONCOR/LCRA TSC Tier 1 |
Planned Future tab |
765 | Dec 2030 | Sand Lake to Big Hill Ward / Schleicher County |
Sand Lake, Big Hill |
| SandLake - North McCamey Transmission Line Addition LCRA TSC and ONCOR joint project to add the Sand Lake-North McCamey 345-kV double-circuit transmission line. 22RPG010. Also see PMCR 69709, LCRATSC_Bearkat_NorthMcCamey_TransmissionLineAddition. ERCOT project 102815 · RPG 22RPG010 · RTP 2021-FW15 |
LCRATSC Tier 1 |
Under Construction Current-year planned tab |
345 | Jun 2026 | North McCamey to Sand Lake Glasscock / Ward County |
North McCamey, Sand Lake |
| Drill Hole - Sand Lake 765 kV Line Add a new Drill Hole - Sand Lake 765 kV Line ERCOT project 103782 · utility no. R8892 · RPG 25RPG022 |
ONCOR Tier 1 |
Planned Future tab |
765 | May 2030 | Drill Hole to Sand Lake Culberson / Ward County |
Drill Hole, Sand Lake |
| Bearkat - North McCamey Transmission Line Addition LCRA TSC and WETT joint project to add the Bearkat-North McCamey 345-kV double-circuit transmission line. 22RPG010 ERCOT project 69709 · RPG 22RPG010 · RTP 2021-FW15 |
LCRATSC Tier 1 |
Under Construction Current-year planned tab |
345 | Jun 2026 | Bearkat to Sand Lake Glasscock / Ward County |
Bearkat, Sand Lake |
| Hays Hill (fka Rock Draw) 345 kV Switch Adding Oncor's portion of TNMP Silverleaf and Cowpen 345/138-kV Stations Project (23RPG013) ERCOT project 78044 · utility no. R8716 · RPG 23RPG013 |
ONCOR Tier 1 |
Planned Future tab |
345 | Dec 2027 | Sand Lake to North McCamey Ward / Upton County |
Sand Lake, North McCamey |
| Blue Goose (fka Toyah Creek) 345 kV Switch Adding Oncor's portion of TNMP Silverleaf and Cowpen 345/138-kV Stations Project (23RPG013) ERCOT project 78046 · utility no. R8715 · RPG 23RPG013 |
ONCOR Tier 1 |
Planned Future tab |
345 | May 2027 | Sand Lake to Solstice Ward / Pecos County |
Sand Lake, Solstice |
| Sand Lake 765/345 kV Autotransformer #1 Add Permian Basin Reliability Plan Upgrade ID 765_Import_2C. Establish the Sand Lake 765/345 kV Switch with one 765/345 kV autotransformer ERCOT project 99241 · utility no. PB_765_Import2_C |
ONCOR Tier 1 |
Planned Future tab |
765 | Dec 2030 | Sand Lake to Sand Lake Ward County |
Sand Lake |
| Sand Lake 765/345 kV Autotransformer #2 Add Permian Basin Reliability Plan Upgrade ID 765_Import_2C. Add a second 765/345 kV autotransformer at Sand Lake ERCOT project 99263 · utility no. PB_765_Import2_C |
ONCOR Tier 1 |
Planned Future tab |
765 | Dec 2030 | Sand Lake to Sand Lake Ward County |
Sand Lake |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 78044 | Projected in-service date | May 2027 → Dec 2027 |
| October 1, 2026 | 78046 | Projected in-service date | Dec 2027 → May 2027 |
| June 1, 2026 | 102815 | Status as reported | Planned → Under Construction |
| June 1, 2026 | 103782 | First listed | on the Future tab |
| June 1, 2026 | 69709 | Status as reported | Planned → Under Construction |
| June 1, 2026 | 78046 | Projected in-service date | May 2027 → Dec 2027 |
| February 1, 2026 | 102815 | First listed | on the Current-year planned tab |
| February 1, 2026 | 69709 | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 78044 | Projected in-service date | Dec 2026 → May 2027 |
| February 1, 2026 | 78046 | Projected in-service date | Dec 2026 → May 2027 |
| October 1, 2025 | 100597 | First listed | on the Future tab |
| October 1, 2025 | 99241 | First listed | on the Future tab |
| October 1, 2025 | 99263 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.