Blu Lacy
Named in 5 listed projects in ERCOT’s transmission project tracking workbook, in Nueces County. First named in the release with data as of June 1, 2024.
Described as new. The quoted wording calls this substation new. “Blu Lacy: Construct New 765/345 kV Station” — project 102885 title, as the utility reported it
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Nueces, TX: ERCOT queue, 13 active of 13. Same county, not the same substation.
Location
Nueces County, TX
County only. A source prints the county; no point is published. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: No point. The only public drawing found is the 'Proposed Blu Lacy Substation' triangle on AEP Texas's regional fact-sheet maps (Blu Lacy - Howard, 7/21/2026; Hillje - Blu Lacy, 7/6/2026, and the Hillje - Blu Lacy open-house project map). Those maps cover ~250 km per page and the triangle alone is ~3 km wide at their scale, so a read would be worse than +/- 1 km.
Note: AEP's fact sheets say the station is 'located near Nueces County' rather than in it, while TPIT prints Nueces; the regional maps draw the triangle south-west of Corpus Christi near the Nueces / Jim Wells / Kleberg area, so the county is not settled. TPIT 103809's title says 'Blu Lacy to Hillje' but its description repeats 'from Blu Lacy to Howard'.
Sources: AEP Texas / CPS Energy, Blu Lacy - Howard Transmission Line Project fact sheet (2026-07-21), p.2 map · AEP Texas / CenterPoint Energy, Hillje - Blu Lacy Transmission Improvement Project fact sheet (2026-07-06), p.2 map · AEP Texas, Hillje - Blu Lacy open-house boards (2026), board 2 · ERCOT Board item 14.1, 25RPG025 765-kV STEP Eastern Backbone Project (2025-12-01) · ERCOT TPIT, projects 102885, 102901, 103797G, 103809, 110838 (release 39, 2026-10-01). Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Blu Lacy: Construct New 765/345 kV Station Construct new 765/345 kV station on the Lon Hill to Reforzar and Lon Hill to Nelson Sharpe 345 kV lines ERCOT project 102885 · utility no. TP2025322 · RPG 25RPG025 |
AEP TCC Tier 1 |
Planned Future tab |
765 | Jan 2032 | Blu Lacy Nueces County |
Blu Lacy |
| Blu Lacy to Howard: Construct New 765 kV Line Construct a new 765 kV single circuit line from Blu Lacy to Howard ERCOT project 102901 · utility no. TP2025322 · RPG 25RPG025 |
AEP TCC Tier 1 |
Planned Future tab |
765 | Jan 2032 | Blu Lacy to Howard Nueces / Bexar County |
Blu Lacy, Howard |
| This models CEHE's Portion of the 765 kV STEP project Install 765kV line from CEHE's Morley substation to AEP Blu Lacy substation. ERCOT project 103797G · RPG 25RPG025 |
CNP Tier 1 |
Planned Future tab |
765 | Dec 2031 | MORLEY to Blu Lacy Wharton / Nueces County |
MORLEY, Blu Lacy |
| Blu Lacy to Hillje: Construct New 765 kV Line Construct a new 765 kV single circuit line from Blu Lacy to Howard ERCOT project 103809 · utility no. TP2025322 · RPG 25RPG025 |
AEP TCC Tier 1 |
Planned Future tab |
765 | Jan 2032 | Blu Lacy to Hillje Nueces / Wharton County |
Blu Lacy, Hillje |
| Ad Hoc TPIT: Expansion of Sharyland's Kingfisher 765 kV Station Expansion of Sharyland's Kingfisher Station to accommodate 765 kV voltage levels and ties. Proposed alternative is in line with ERCOT's 2024 RTP STEP Plan ERCOT project 110838 · RPG 26RPG009 |
SLU Tier 1 |
Conceptual Future tab |
765 | Dec 2031 | Kingfisher to Blu Lacy Cameron / Nueces County |
Kingfisher, Blu Lacy |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 102885 | Projected in-service date | Nov 2031 → Jan 2032 |
| October 1, 2026 | 102901 | Projected in-service date | Nov 2031 → Jan 2032 |
| October 1, 2026 | 103809 | Projected in-service date | Nov 2031 → Jan 2032 |
| July 13, 2026 | 110838 | First listed | on the Future tab |
| June 1, 2026 | 102885 | First listed | on the Future tab |
| June 1, 2026 | 102901 | First listed | on the Future tab |
| June 1, 2026 | 103797G | First listed | on the Future tab |
| June 1, 2026 | 103809 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.