Resnik
Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in San Patricio County. First named in the release with data as of October 1, 2019.
San Patriciocounty as printed
138kV
AEP TCCutility
3projects listed
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in San Patricio, TX: ERCOT queue, 27 active of 28. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Resnik: Epand 138 kV Station Interconnect Gregory Power Partners (GPP) to the Existing Resnik 138 kV Station ERCOT project 111307 · utility no. TP2026170 |
AEP TCC Tier 4 |
Planned Future tab |
138 | Dec 2028 | Resnik San Patricio County |
Resnik |
| Dupont to Resnik: Rebuild 138 kV Line Rebuild the Dupont to Resnik 138 kV line ERCOT project 69467 |
AEP TCC Tier 4 |
In-Service Completed tab |
138 | Jun 2025 actual 2025-05 |
Dupont to Resnik San Patricio County |
Dupont, Resnik |
| Hecker to Resnik: Rebuild 138 kV Line Rebuild the Hecker to Resnik 138 kV line ERCOT project 76286 · utility no. TP2023506 |
AEP TCC Tier 4 |
Planned Future tab |
138 | Feb 2028 | Hecker to Resnik San Patricio County |
Hecker, Resnik |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 111307 | First listed | on the Future tab |
| October 1, 2026 | 69467 | Moved between tabs | Current-year planned → Completed |
| October 1, 2026 | 76286 | Moved between tabs | Current-year planned → Future |
| October 1, 2026 | 76286 | Projected in-service date | Jul 2026 → Feb 2028 |
| February 1, 2026 | 69467 | Status as reported | Planned → In-Service |
| February 1, 2026 | 76286 | Moved between tabs | Future → Current-year planned |
| October 1, 2025 | 69467 | Projected in-service date | May 2025 → Jun 2025 |
| October 1, 2025 | 76286 | Projected in-service date | Jun 2026 → Jul 2026 |
| June 1, 2025 | 69467 | Moved between tabs | Future → Current-year planned |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.