Fort Stockton Switch
Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Pecos County. First named in the release with data as of February 1, 2016.
Expansion at an existing substation: new or expanded yard. The quoted wording describes a new or expanded yard, bus, bay or station at this substation. “Expand 345 kV Station” — project 93226, as the utility reported it
A HIFLD substation record has the same name and county: FORT STOCKTON (PECOS County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Pecos, TX: ERCOT queue, 58 active of 63. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Fort Stockton Switch: Construct New 138 kV Terminal Construct a new 138 kV terminal at Fort Stockton Switch for the new TNMP line to Woodhouse ERCOT project 111270 · RPG 23RPG023 |
AEP TNC Tier 1 |
Planned Future tab |
138 | Aug 2027 | Fort Stockton Switch Pecos County |
Fort Stockton Switch |
| Fort Stockton Switch: Expand 345 kV Station Install three 345/138 kV autotransformers at the Fort Stockton Switch 345/138 kV station ERCOT project 93226 · utility no. TP2025141 · RPG H.B. 5066 |
AEP TNC Tier 1 |
Planned Future tab |
345 | Apr 2029 | Fort Stockton Switch Pecos County |
Fort Stockton Switch |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 111270 | First listed | on the Future tab |
| February 1, 2026 | 93226 | Projected in-service date | Dec 2030 → Apr 2029 |
| October 1, 2025 | 93226 | Projected in-service date | Apr 2027 → Dec 2030 |
| June 1, 2025 | 93226 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.