SUNLIT
Named in 0 listed projects in ERCOT’s transmission project tracking workbook, in Harris County, plus 2 on its Cancelled tab. First named in the release with data as of February 1, 2023.
Projects cancelled. Every project naming SUNLIT is on the Cancelled tab of ERCOT's workbook.
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Harris, TX: ERCOT queue, 30 active of 35 · MISO queue, 0 active of 1. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
On the Cancelled tab
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Ashville (ASH) 138kV CEHE Station for SUNLIT/Dori BQ Solar (23INR0040) and Dori BQ BESS (24INR0196) Install one generator lead from CEHE 138kV substation Ashville (ASH) to SUNLIT/Dori BQ Solar. Utilize same generator lead as Dori BQ BESS. ERCOT project 72029B |
CNP Tier 4 |
Conceptual Cancelled tab |
138 | Dec 2026 | Ashville to SUNLIT Harris County |
Ashville, SUNLIT |
| Ashville (ASH) 138kV CEHE Station for SUNLIT/Dori BQ Solar (23INR0040) and Dori BQ BESS (24INR0196) Install one generator lead from CEHE 138kV substation Ashville (ASH) to SUNLIT/Dori BQ BESS. Utilize same generator lead as Dori BQ Solar. ERCOT project 72029C |
CNP Tier 4 |
Conceptual Cancelled tab |
138 | Dec 2026 | Ashville to SUNLIT Harris County |
Ashville, SUNLIT |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 72029B | Moved between tabs | Current-year planned → Cancelled |
| October 1, 2026 | 72029B | Status as reported | Planned → Conceptual |
| October 1, 2026 | 72029C | Moved between tabs | Current-year planned → Cancelled |
| October 1, 2026 | 72029C | Status as reported | Planned → Conceptual |
| February 1, 2026 | 72029B | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 72029C | Moved between tabs | Future → Current-year planned |
| October 1, 2025 | 72029B | Projected in-service date | Apr 2026 → Dec 2026 |
| October 1, 2025 | 72029C | Projected in-service date | Apr 2026 → Dec 2026 |
| February 1, 2025 | 72029B | Projected in-service date | Feb 2025 → Apr 2026 |
| February 1, 2025 | 72029C | First listed | on the Future tab |
| June 1, 2024 | 72029B | Projected in-service date | Oct 2024 → Feb 2025 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.