PORTSOUTH

Named in 4 listed projects in ERCOT’s transmission project tracking workbook, in Cameron County. First named in the release with data as of July 13, 2026.

Cameroncounty as printed
138kV
STECutility
4projects listed

Described as new. The quoted wording calls this substation new. “new Portsouth 138-kV substation” — project 110240 description, as the utility reported it

Also printed as: Portsouth

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Cameron, TX: ERCOT queue, 30 active of 32. Same county, not the same substation.

Location

25.9372, -97.3982 · Cameron County, TX · view on a map

Read off a planning map. Read off a planning map by matching it to roads and other mapped features. Accurate to about ±600 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

How it was located: Symbol anchored: the light-blue new 138-kV substation circle labelled Portsouth on ERCOT's Option 1 map (April 2026 status update p.8), where the dashed new 138-kV line to Boca Chica starts, just east of the Hwy 511 circle. Read off the map (embedded image 1399x1142 px, ~35 m/px) with a least-squares affine fit on OSM substations Waterport (way 513362268), Highway 511 (513362277), Central Avenue (512007635), Military Highway (513383712), Palmito (487061712), La Palma 345 kV (174789441) and East Rio Hondo (512007640); residuals 0.02-0.5 km, Hwy 511 (nearest anchor) 0.05 km. The map's inset A1 (Waterport, Hwy 511, Portsouth at larger scale) puts Portsouth ~0.5 km north-east of Hwy 511 instead (~25.940,-97.403), a ~0.5 km difference. +/- ~600 m.

Note: ERCOT's final 25RPG039 report (completed 2026-05-14) is on the certificate-only MIS, so the recommended option is not confirmed from a public page; Portsouth is in Options 1 and 2 but not in ERCOT's Option 3. TPIT's Planned entries (111361, 111370, 111376) carry Portsouth, consistent with Option 1, and the recommended cost ($96.60M) is close to Option 1's estimate ($96.35M). Main map and inset A1 differ by ~0.5 km.

County: the Census county at this point.

Sources: ERCOT Independent Review status update, STEC Southeast Brownsville Large Load Transmission System Improvements Project (25RPG039), RPG meeting April 2026 (2026-04-09), p.8 · ERCOT System Planning monthly status report to ROS, May 2026 (2026-07-02), RPG project status: 25RPG039 · ERCOT Transmission Project and Information Tracking (TPIT) workbook, projects 110240, 111361, 111370, 111376; cancelled 48854 (release 2026-10) · OpenStreetMap: Brownsville-area substations used as anchors (OSM base 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Southeast Brownsville Large load transmission system improvements project
-Construct a new Portsouth 138-kV substation with six terminals: Hairpin the new Portsouth 138kV substaiton onto the existing HWY 511 to S Carbide (Chalybe) 138kV tline using single ckt structures which creates the new HWY511- Portsouth and Portsouth-Chalybe 138kV tlines Hairpin Portsouth onto the existing Waterport to Southmost 138kV tline using single ckt structures which creats the new Waterpor…
ERCOT project 110240 · RPG 25RPG039
STEC
Tier 2
Conceptual
Future tab
138 Jul 2028 Portsouth to Boca Chica
Cameron County
Portsouth, Boca Chica
Add Portsouth loop in Southmost - Waterport
ERCOT project 111361 · RPG 25RPG039
STEC
Tier 2
Planned
Future tab
138 Jul 2028 PORTSOUTH to PORTSOUTH
Cameron County
PORTSOUTH
Hairpin Portsouth HWY511 to Chalybe
ERCOT project 111370 · RPG 25RPG039
STEC
Tier 2
Planned
Future tab
138 Sep 2028 PORTSOUTH to PORTSOUTH
Cameron County
PORTSOUTH
Add Boca Chica and double ckt to portsouth
ERCOT project 111376 · RPG 25RPG039
STEC
Tier 2
Planned
Future tab
138 Jul 2028 Boca Chica to PORTSOUTH
Cameron County
Boca Chica, PORTSOUTH

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
October 1, 2026111361First listedon the Future tab
October 1, 2026111370First listedon the Future tab
October 1, 2026111376First listedon the Future tab
July 13, 2026110240First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.