HOPSON
Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Chambers County, plus 1 on its Cancelled tab. First named in the release with data as of October 1, 2018.
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Chambers, TX: ERCOT queue, 2 active of 3 · MISO queue, 1 active of 3. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Upgrades related to the Baytown Area Load Addition Upgrade Ckt.84K HOPSON to WARVUE to increase thermal limits. ERCOT project 111323A · RTP 26RPG006 |
CNP Tier 3 |
Planned Future tab |
138 | May 2028 | HOPSON to WARVUE Chambers County |
HOPSON, WARVUE |
| Cedar Bayou 5 Generator Interconnection (23INR0029) Upgrade Ckt.84K HOPSON to WARVUE to increase thermal limits. ERCOT project 90173C |
CNP Tier 4 |
Planned Future tab |
138 | Jun 2027 | HOPSON to WARVUE Chambers County |
HOPSON, WARVUE |
| Jordan / Mont Belvieu Area Improvement Project Install new CEHE-owned Sjolander substation. Reconfigure existing Ckt.84D Cedar Bayou to CD/HOPSON and loop into Sjolander substation to create new Ckt.84 Cedar Bayou to Cedar Bayou tap to Sjolander to HOPSON. ERCOT project 90255F · RPG 24RPG026 |
CNP Tier 3 |
Planned Future tab |
138 | May 2028 | Sjolander to Cedar Bayou /HOPSON Chambers County |
Sjolander, Cedar Bayou, HOPSON |
On the Cancelled tab
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Upgrades related to the Baytown Area Load Addition Upgrade Ckt.84K HOPSON to WARVUE to increase thermal limits. ERCOT project 102546A · RTP 24RPG028 |
CNP Tier 1 |
Conceptual Cancelled tab |
138 | May 2028 | HOPSON to WARVUE Chambers County |
HOPSON, WARVUE |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 102546A | Moved between tabs | Future → Cancelled |
| October 1, 2026 | 102546A | Status as reported | Planned → Conceptual |
| October 1, 2026 | 111323A | First listed | on the Future tab |
| June 1, 2026 | 102546A | First listed | on the Future tab |
| June 1, 2026 | 90255F | Projected in-service date | May 2027 → May 2028 |
| June 1, 2025 | 90255F | First listed | on the Future tab |
| February 1, 2025 | 90173C | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.