Deepwater
Named in 6 listed projects in ERCOT’s transmission project tracking workbook, in Harris County. First named in the release with data as of February 1, 2020.
A HIFLD substation record has the same name and county: DEEPWATER (HARRIS County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Harris, TX: ERCOT queue, 30 active of 35 · MISO queue, 0 active of 1. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| TEXPET Customer and Area 138kV Conversions. Remove 69kV TEXPET customer substation facilities. Install new 138kV TEXPET customer substation. Expand Clinton 138kV and Mag Park 138kV substations. Deenergize the non-upgraded portions of Ckt.33x. Energize the rebuilt portions of Ckt.33x as 138kV Ckt.xx Mag Park to TEXPET 138kV to Deepwater. Expect this circuit position at Mag Park to take over the existing MP-TR5 transformer service. ERCOT project 109585A |
CNP Tier 4 |
Planned Future tab |
138 | May 2028 | TEXPET to Clinton/Deepwater Harris County |
TEXPET, Clinton, Deepwater |
| TEXPET Customer and Area 138kV Conversions. De-energize 69kV Ckt.16C Deepwater to South Channel. De-energize 69kV Ckt.23A Deepwater to South Channel. De-energize 138/69kV South Channel auto A1 and all remaining South Channel 69kV facilities. Retire all remaining Deepwater 69kV facilities. ERCOT project 109585C |
CNP Tier 4 |
Planned Future tab |
69 | May 2028 | Deepwater to South Channel Harris County |
Deepwater, South Channel |
| MINING 138kV Conversion and BENTON customer substation removal(24RPG033). Rebuild/Repurpose existing 69kV Ckt.16C MINING Switchrack to MINING tap section. Retire MINING Switchrack from Ckt.16C to create new Ckt.16C Deepwater to South Channel. Remove customer-owned BENTON substation from CEHE service. Retire MINING 69kV substation. ERCOT project 67427A · RPG 24RPG033 |
CNP Tier 4 |
Planned Future tab |
69 | Dec 2027 | Deepwater to South Channel Harris County |
Deepwater, South Channel |
| Deepwater to Clinton Ckts.33B-33C Line Upgrades Fully reconductor Ckt.33B Deepwater to Texpet Switchrack to Harrisburg ahead of future 138kV conversions. ERCOT project 69888A |
CNP Tier 4 |
Planned Current-year planned tab |
69 | Dec 2026 | Deepwater to Harrisburg Harris County |
Deepwater, Harrisburg |
| Replace Harrisburg with new Manchester Subsation Remove Harrisburg from Ckts. 33B & 33C service to create new Ckt.33 TEXPET to Clinton. ERCOT project 98994A |
CNP Tier 4 |
Planned Future tab |
138 | Dec 2027 | Deepwater to TEXPET Harris County |
Deepwater, TEXPET |
| Facility Ratings Methodology Phase 2 (FRM2) Upgrades Upgrade Ckt.69B Greens Bayou to Deepwater to increase thermal limits as part of FRM2 upgrades ERCOT project 99453B |
CNP Tier 4 |
Planned Future tab |
345 | Mar 2028 | Greens Bayou to Deepwater Harris County |
Greens Bayou, Deepwater |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 99453B | Moved between tabs | Current-year planned → Future |
| October 1, 2026 | 99453B | Projected in-service date | Dec 2026 → Mar 2028 |
| July 13, 2026 | 109585A | First listed | on the Future tab |
| July 13, 2026 | 109585C | First listed | on the Future tab |
| July 13, 2026 | 69888A | Projected in-service date | Mar 2026 → Dec 2026 |
| July 13, 2026 | 98994A | Projected in-service date | May 2027 → Dec 2027 |
| July 13, 2026 | 99453B | Projected in-service date | May 2026 → Dec 2026 |
| June 1, 2026 | 67427A | Projected in-service date | May 2027 → Dec 2027 |
| February 1, 2026 | 69888A | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 69888A | Projected in-service date | Dec 2026 → Mar 2026 |
| February 1, 2026 | 99453B | Moved between tabs | Future → Current-year planned |
| October 1, 2025 | 98994A | First listed | on the Future tab |
| October 1, 2025 | 99453B | First listed | on the Future tab |
| February 1, 2025 | 67427A | First listed | on the Future tab |
| June 1, 2024 | 69888A | Projected in-service date | May 2026 → Dec 2026 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.