Seabreeze
Named in 6 listed projects in ERCOT’s transmission project tracking workbook, in Brazoria County. First named in the release with data as of February 1, 2023.
Described as new. The quoted wording calls this substation new. “New 345kV Seabreeze (SEB) substation” — project 72037A description, as the utility reported it
Reported complete. Project 72037A is on the Completed tab (actual in-service 2025-05); Project 72037B is on the Completed tab (actual in-service 2025-05), as the utility reported it. That indicates the substation may now be built; it is not a confirmation.
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Brazoria, TX: ERCOT queue, 54 active of 63. Same county, not the same substation.
Location
Brazoria County, TX
On a named line, no point. No point is published. The planning documents place it on the transmission line named in the quote above, and both ends of that line are located. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
Note: Already in service: TPIT 72037A/B are on the Completed tab, In-Service, ISD 2025-05. Not tagged in OSM (no substation of that name, and no unnamed yard on the Dow - Oasis line could be tied to it).
Sources: ERCOT TPIT, projects 72037A, 72037B, 109613, 110063, 75830A, 78468A (release 39, 2026-10-01) · OpenStreetMap: Dow and Oasis substations; 345 kV lines in Brazoria County (OSM base 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Install generation for Pinewood Solar (25INR0170) at Seabreeze 345kV CEHE substation. Connect at the same generator lead as Tanglewood Solar. ERCOT project 109613 |
CNP Tier 4 |
Planned Current-year planned tab |
345 | Oct 2026 | Seabreeze to TANGLE Brazoria County |
Seabreeze, TANGLE |
| This models upgrades required for a proposed load addition. Connect customer load at Seabreeze or TANGLEWOOD substations ERCOT project 110063 |
CNP Tier 4 |
Conceptual Future tab |
345 | Dec 2027 | Seabreeze to Seabreeze Brazoria County |
Seabreeze |
| Seabreeze 345kV Substation for Tanglewood Solar (23INR0054) New 345kV Seabreeze (SEB) substation for generator interconnection to Tanglewood Solar (23INR0054). Loop Ckt.27B into Seabreeze substation to create new Ckt.27 DOW to Seabreeze to Oasis. ERCOT project 72037A |
CNP Tier 4 |
In-Service Completed tab |
345 | May 2025 actual 2025-05 |
Seabreeze to DOW/Oasis Brazoria County |
Seabreeze, DOW, Oasis |
| Seabreeze 345kV Substation for Tanglewood Solar (23INR0054) Install generator lead from Seabreeze (SEB) substation to TANGLE (TNG) customer substation (23INR0054). ERCOT project 72037B |
CNP Tier 4 |
In-Service Completed tab |
345 | May 2025 actual 2025-05 |
Seabreeze to TANGLE Brazoria County |
Seabreeze, TANGLE |
| New 345kV Savannah (SAV) substation for generator interconnection to Cascade Solar (23INR0091). New 345kV Savannah (SAV) substation for generator interconnection to Cascade Solar (23INR0091). Loop Ckt.27 into Savannah substation to create new Ckt.27 Seabreeze to Savannah to Oasis. ERCOT project 75830A |
CNP Tier 4 |
Planned Future tab |
345 | May 2028 | Savannah to Seabreeze/Oasis Brazoria County |
Savannah, Seabreeze, Oasis |
| Pradera (PRD) CEHE-Owned 345kV Substation for Austin Bayou Solar (25INR0102) New 345kV Pradera (PRD) substation for generator interconnection to Austin Bayou Solar (25INR0102). Loop Ckt.27 into Pradera substation to create new Ckt.27 Seabreeze to Pradera to Savannah. ERCOT project 78468A |
CNP Tier 4 |
Planned Future tab |
345 | Jan 2028 | Pradera to Savannah/Seabreeze Brazoria County |
Pradera, Savannah, Seabreeze |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 78468A | Projected in-service date | Sep 2027 → Jan 2028 |
| July 13, 2026 | 109613 | Projected in-service date | Sep 2026 → Oct 2026 |
| July 13, 2026 | 109613 | First listed | on the Current-year planned tab |
| July 13, 2026 | 110063 | First listed | on the Future tab |
| July 13, 2026 | 75830A | Projected in-service date | Dec 2027 → May 2028 |
| July 13, 2026 | 78468A | Moved between tabs | Current-year planned → Future |
| July 13, 2026 | 78468A | Projected in-service date | Dec 2026 → Sep 2027 |
| June 1, 2026 | 72037A | Moved between tabs | Current-year planned → Completed |
| June 1, 2026 | 72037A | Status as reported | Planned → In-Service |
| June 1, 2026 | 72037B | Moved between tabs | Current-year planned → Completed |
| June 1, 2026 | 72037B | Status as reported | Planned → In-Service |
| February 1, 2026 | 75830A | Projected in-service date | Dec 2026 → Dec 2027 |
| February 1, 2026 | 78468A | Moved between tabs | Future → Current-year planned |
| October 1, 2025 | 72037A | Projected in-service date | Nov 2025 → May 2025 |
| October 1, 2025 | 72037B | Projected in-service date | Nov 2025 → May 2025 |
| October 1, 2025 | 75830A | Moved between tabs | Current-year planned → Future |
| October 1, 2025 | 75830A | Projected in-service date | Dec 2025 → Dec 2026 |
| October 1, 2025 | 78468A | Projected in-service date | Jan 2027 → Dec 2026 |
| June 1, 2025 | 72037A | Moved between tabs | Future → Current-year planned |
| June 1, 2025 | 72037B | Moved between tabs | Future → Current-year planned |
| June 1, 2025 | 75830A | Moved between tabs | Future → Current-year planned |
| June 1, 2025 | 78468A | Projected in-service date | Dec 2026 → Jan 2027 |
| February 1, 2025 | 72037A | Projected in-service date | Jan 2025 → Nov 2025 |
| February 1, 2025 | 72037B | Projected in-service date | Jan 2025 → Nov 2025 |
| February 1, 2025 | 78468A | First listed | on the Future tab |
| October 1, 2024 | 72037A | Projected in-service date | May 2025 → Jan 2025 |
| October 1, 2024 | 72037B | Projected in-service date | May 2025 → Jan 2025 |
| October 1, 2024 | 75830A | Projected in-service date | May 2025 → Dec 2025 |
| June 1, 2024 | 72037A | Projected in-service date | Jan 2025 → May 2025 |
| June 1, 2024 | 72037B | Projected in-service date | Jan 2025 → May 2025 |
| June 1, 2024 | 75830A | Projected in-service date | Jun 2025 → May 2025 |
| June 1, 2024 | 78468A | No longer listed | future |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.