Substation Scout

Cedar Creek

Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Wharton County. First named in the release with data as of June 1, 2021.

Whartoncounty as printed
345kV
CNPutility
2projects listed

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Wharton, TX: ERCOT queue, 42 active of 44. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
This models the new CEHE Raider Substation and upgrades required for a proposed load addition
Install new 345kV CEHE Raider substation. Loop 345 kV Ckt. 72 Bailey-Cedar Creek line into the new 345 kV Raider substation. Upgrade line relaying on Ckt 72 Cedar Creek-Raider-Bailey. Remove temporary 138 kV service.
ERCOT project 110068A
CNP
Tier 4
Planned
Future tab
345 May 2027 Raider to Cedar Creek/Bailey
Wharton County
Raider, Cedar Creek, Bailey
Buffalo Creek BESS (26INR0405) at Cedar Creek 345kV CEHE Substation
Interconnect new generation facility for Buffalo Creek BESS (26INR0405) at Cedar Creek 345kV CEHE Substation. Utilize existing generator lead. Remove existing generator lead conductor and install new bundled 959ACSS conductor.
ERCOT project 99397
CNP
Tier 4
In-Service
Completed tab
345 Dec 2025
actual 2025-12
Cedar Creek to Buffalo Creek
Wharton County
Cedar Creek, Buffalo Creek

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
October 1, 2026110068AMoved between tabsCurrent-year planned → Future
October 1, 2026110068AStatus as reportedConceptual → Planned
October 1, 2026110068AProjected in-service dateOct 2026 → May 2027
July 13, 2026110068AFirst listedon the Current-year planned tab
February 1, 202699397Moved between tabsCurrent-year planned → Completed
February 1, 202699397Status as reportedPlanned → In-Service
February 1, 202699397Projected in-service dateNov 2025 → Dec 2025
October 1, 202599397First listedon the Current-year planned tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.