Substation Scout

North Belt

Named in 5 listed projects in ERCOT’s transmission project tracking workbook, in Harris County. First named in the release with data as of June 1, 2016.

Harriscounty as printed
138, 345kV
CNPutility
5projects listed

A HIFLD substation record has the same name and county: NORTH BELT (HARRIS County). The names agree; that does not confirm they are the same facility.

Generation interconnection requests filed in Harris, TX: ERCOT queue, 30 active of 35 · MISO queue, 0 active of 1. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Upgrade Ckt.67B North Belt to DRILCO to increase thermal limits.
ERCOT project 102540
CNP
Tier 4
Planned
Future tab
138 Dec 2027 North Belt to DRILCO
Harris County
North Belt, DRILCO
DRILCO Area improvements in support of proposed load addition.
Upgrade Substation equipment at DRILCO and North Belt to increase rating of ckt 67
ERCOT project 109847A
CNP
Tier 4
Conceptual
Future tab
138 Jun 2027 DRILCO to North Belt
Harris County
DRILCO, North Belt
This models upgrades required for a proposed load addition
Install 345 kV substation. Loop 345 kV Circuit 97 Jordan to King into the new 345 kV substation. Install 200MVAR Cap Bank at new sub.
ERCOT project 110090B
CNP
Tier 4
Conceptual
Future tab
345 Jul 2029 NEWSUB to Jordan/North Belt
Harris County
Jordan, North Belt
Facility Ratings Methodology Phase 2 (FRM2) Upgrades
Upgrade Ckt.97A North Belt to TH Wharton to increase thermal limits as part of FRM2 upgrades.
ERCOT project 99453D
CNP
Tier 4
In-Service
Completed tab
345 May 2026
actual 2026-02
North Belt to TH Wharton
Harris County
North Belt, TH Wharton
Facility Ratings Methodology Phase 2 (FRM2) Upgrades
Upgrade Ckt.97B King to North Belt to increase thermal limits as part of FRM2 upgrades.
ERCOT project 99453E
CNP
Tier 4
Planned
Future tab
345 May 2027 King to North Belt
Harris County
King, North Belt

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
October 1, 202699453EMoved between tabsCurrent-year planned → Future
October 1, 202699453EProjected in-service dateOct 2026 → May 2027
July 13, 2026102540Projected in-service dateMay 2027 → Dec 2027
July 13, 202699453EProjected in-service dateJun 2026 → Oct 2026
July 13, 2026109847AFirst listedon the Future tab
July 13, 2026110090BFirst listedon the Future tab
July 13, 202699453EProjected in-service dateMay 2026 → Jun 2026
June 1, 202699453DMoved between tabsCurrent-year planned → Completed
June 1, 202699453DStatus as reportedPlanned → In-Service
February 1, 2026102540First listedon the Future tab
February 1, 202699453DMoved between tabsFuture → Current-year planned
February 1, 202699453EMoved between tabsFuture → Current-year planned
February 1, 202699453EProjected in-service dateOct 2029 → May 2026
October 1, 202599453DFirst listedon the Future tab
October 1, 202599453EFirst listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.