Mason Switch
Named in 1 listed project in ERCOT’s transmission project tracking workbook, in Menard County. First named in the release with data as of October 1, 2021.
No HIFLD substation record has this name in this county (a record of the same name exists in another county).
Generation interconnection requests filed in Menard, TX: ERCOT queue, 2 active of 2. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Mason Switch to Yellowjacket: Rebuild 69 kV Line Rehab the Mason Switch to Yellowjacket 69 kV Line ERCOT project 65154 · utility no. 2836 · RPG 21RPG014 |
AEP TNC Tier 4 |
Planned Future tab |
69 | Feb 2028 | Mason Switch to Yellowjacket Menard / Mason County |
Mason Switch, Yellowjacket |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 65154 | Projected in-service date | Dec 2027 → Feb 2028 |
| February 1, 2026 | 65154 | Projected in-service date | Jan 2027 → Dec 2027 |
| June 1, 2024 | 65154 | Projected in-service date | Jan 2026 → Jan 2027 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.