Helotes
Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Bexar County. First named in the release with data as of February 1, 2015.
Described as new. The quoted wording calls this substation new. “new Helotes 345kV substation” — project 110263 title, as the utility reported it
A HIFLD substation record has the same name and county: HELOTES (BEXAR County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Bexar, TX: ERCOT queue, 22 active of 23. Same county, not the same substation.
Location
29.5482, -98.6819 · Bexar County, TX · view on a map
OpenStreetMap, corroborated. An OpenStreetMap feature carries this exact name, and a cited source agrees. Accurate to about ±200 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: OSM way 97043744 'Helotes Substation' (operator CPS Energy, voltage 138000), centroid. ERCOT's recommended Option 3A says the new 345-kV yard is a conversion of 'the existing Helotes 138-kV substation', so the existing station's point is the station itself, not a neighbour. Corroborated by OSM 345 kV line way 91982757 passing 0.11 km from the station, consistent with looping 'the existing Hill Country to Cagnon 345-kV transmission line into the new Helotes 345-kV substation'. The new 345-kV yard may extend beyond the existing fence; +/- ~200 m.
Note: Not a new site: ERCOT describes a conversion of the existing Helotes 138-kV substation into a 345/138-kV switching substation (closer to an expansion with a new voltage level than a new substation). TPIT 110263 status 'Under Construction', ISD 2028-05; ERCOT's board report gives an expected ISD of October 2031 for the combined project.
County: the Census county at this point.
Sources: ERCOT Board item 5.1: CPS Combined Reactive Power Planning Project & Helotes 345/138-kV Switching Station and Autotransformer Addition at Eastside Switching Station (25RPG013/25RPG017) (2026-05-22), pp.1-3 · OpenStreetMap: Helotes Substation; 345 kV line way 91982757 (OSM base 2026-11-20) · ERCOT TPIT, projects 110263, 109956, 100687 (release 39, 2026-10-01). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Install a 50MVAr Capacitor Bank at Helotes Substation ERCOT project 100687 · utility no. S-1075 |
CPS/NO Tier 4 |
Planned Future tab |
138 | Jun 2029 | 5200 Bexar County |
Helotes |
| Rebuild Anderson to Helotes 138kV Transmission Line ERCOT project 109956 · utility no. T-XXXX · RPG 25RPG013 and 25RPG017 |
CPS/NO Tier 1 |
Planned Future tab |
138 | Jan 2032 | 5003 to 5200 Bexar County |
Anderson, Helotes |
| A new Helotes 345kV substation will be constructed ERCOT project 110263 · utility no. T-0410 · RPG 25RPG013 and 25RPG017 |
CPS/NO Tier 1 |
Under Construction Future tab |
345 | May 2028 | 5201 to 5056, 5211, 5200 Bexar County |
Helotes |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 110263 | Status as reported | Planned → Under Construction |
| July 13, 2026 | 109956 | Projected in-service date | Dec 2029 → Jan 2032 |
| July 13, 2026 | 109956 | First listed | on the Future tab |
| July 13, 2026 | 110263 | First listed | on the Future tab |
| October 1, 2025 | 100687 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.