Named in 4 listed projects in ERCOT’s transmission project tracking workbook, in Bastrop County. First named in the release with data as of June 1, 2025.
Bastropcounty as printed
138kV
LCRATSCutility
4projects listed
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Bastrop, TX: ERCOT queue, 14 active of 16. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Utley Substation and Transmission Line Addition Upgrade L_BIGSAN8_1Y (Bus #7316) - L_UTLEY_8_1Y (Bus #7317) 138.0-kV line as an LCP project for Batch Zero Base Load ERCOT project 109866 |
LCRATSC Tier 4 |
Conceptual Future tab |
138 | Dec 2030 | Big Sandy to Utley Bastrop County |
Big Sandy, Utley |
| Bastrop Mesquite - Utley Transmission Line Upgrade LCRA will upgrade the Utley (7317) to Bastrop Mesquite (7320) 138 kV transmission line to a 1148 minimum MVA rated circuit as part of the LCP effort for Batch Zero Base Load. ERCOT project 110276 |
LCRATSC Tier 4 |
Conceptual Future tab |
138 | Dec 2030 | Utley to Bastrop Mesquite Bastrop County |
Utley, Bastrop Mesquite |
| Utley_Substation_and_Transmission_Line_Addition ERCOT project 93250A · utility no. PLC-8065 |
LCRATSC Tier 4 |
Planned Future tab |
138 | May 2028 | No terminals printed Bastrop County |
Utley |
| Bastrop_Mesquite_Utley_Transmission_Line_Addition Provide looped transmission service for BBEC-member load at 138-kV Utley Substation ERCOT project 93306 |
LCRATSC Tier 4 |
Planned Future tab |
138 | May 2029 | 7320 to 7317 Bastrop County |
Utley |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 93250A | First listed | on the Future tab |
| July 13, 2026 | 109866 | First listed | on the Future tab |
| July 13, 2026 | 110276 | First listed | on the Future tab |
| June 1, 2026 | 93250A | No longer listed | future |
| June 1, 2025 | 93250A | First listed | on the Future tab |
| June 1, 2025 | 93306 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.