Utley

Named in 4 listed projects in ERCOT’s transmission project tracking workbook, in Bastrop County. First named in the release with data as of June 1, 2025.

Bastropcounty as printed
138kV
LCRATSCutility
4projects listed

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Bastrop, TX: ERCOT queue, 14 active of 16. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Utley Substation and Transmission Line Addition
Upgrade L_BIGSAN8_1Y (Bus #7316) - L_UTLEY_8_1Y (Bus #7317) 138.0-kV line as an LCP project for Batch Zero Base Load
ERCOT project 109866
LCRATSC
Tier 4
Conceptual
Future tab
138 Dec 2030 Big Sandy to Utley
Bastrop County
Big Sandy, Utley
Bastrop Mesquite - Utley Transmission Line Upgrade
LCRA will upgrade the Utley (7317) to Bastrop Mesquite (7320) 138 kV transmission line to a 1148 minimum MVA rated circuit as part of the LCP effort for Batch Zero Base Load.
ERCOT project 110276
LCRATSC
Tier 4
Conceptual
Future tab
138 Dec 2030 Utley to Bastrop Mesquite
Bastrop County
Utley, Bastrop Mesquite
Utley_Substation_and_Transmission_Line_Addition
ERCOT project 93250A · utility no. PLC-8065
LCRATSC
Tier 4
Planned
Future tab
138 May 2028 No terminals printed
Bastrop County
Utley
Bastrop_Mesquite_Utley_Transmission_Line_Addition
Provide looped transmission service for BBEC-member load at 138-kV Utley Substation
ERCOT project 93306
LCRATSC
Tier 4
Planned
Future tab
138 May 2029 7320 to 7317
Bastrop County
Utley

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
October 1, 202693250AFirst listedon the Future tab
July 13, 2026109866First listedon the Future tab
July 13, 2026110276First listedon the Future tab
June 1, 202693250ANo longer listedfuture
June 1, 202593250AFirst listedon the Future tab
June 1, 202593306First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.