STP
Named in 4 listed projects in ERCOT’s transmission project tracking workbook, in Matagorda County, plus 1 on its Cancelled tab. First named in the release with data as of February 1, 2018.
Matagordacounty as printed
345kV
AEP TCC, CNPutility
4projects listed
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Matagorda, TX: ERCOT queue, 23 active of 30. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Angstrom to STP: Increase 345 kV Line MOT Increase the MOT on the Angstrom to STP 345 kV line ERCOT project 80630 |
AEP TCC Tier 4 |
Under Construction Current-year planned tab |
345 | Nov 2026 | Angstrom to STP San Patricio / Matagorda County |
Angstrom, STP |
| Zoisite: Construct New 345 kV Station and 345 kV Lines to STP Interconnect the HIF load to the new Zoisite 345 kV station and construct two new STP to Zoisite 345 kV lines. Install two (2) capacitor banks. ERCOT project 81238 · utility no. TP2023803 |
AEP TCC Tier 4 |
Planned Future tab |
345 | Dec 2028 | STP to Zoisite Matagorda County |
STP, Zoisite |
| Facility Ratings Methodology Phase 2 (FRM2) Upgrades Upgrade STP equipment on Ckt.44 STP to Hillje to increase thermal limits as part of FRM2 upgrades. ERCOT project 99453W |
CNP Tier 4 |
Planned Current-year planned tab |
345 | Dec 2026 | STP to Hillje Matagorda / Wharton County |
STP, Hillje |
| Facility Ratings Methodology Phase 2 (FRM2) Upgrades Upgrade Hillje equipment on Ckt.44 STP to Hillje to increase thermal limits as part of FRM2 upgrades. ERCOT project 99453X |
CNP Tier 4 |
Planned Current-year planned tab |
345 | Dec 2026 | STP to Hillje Matagorda / Wharton County |
STP, Hillje |
On the Cancelled tab
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| STP to Zoisite: Construct New 345 kV Line Interconnect the HIF load to the new Zoisite 345 kV station on the STP to Zoisite 345 kV line ERCOT project 89993 |
AEP TCC Tier 4 |
Planned Cancelled tab |
345 | Jun 2027 | STP to Zoisite Matagorda County |
STP, Zoisite |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 80630 | Projected in-service date | Jun 2026 → Nov 2026 |
| October 1, 2026 | 81238 | Projected in-service date | May 2028 → Dec 2028 |
| July 13, 2026 | 80630 | Projected in-service date | May 2026 → Jun 2026 |
| July 13, 2026 | 99453X | Projected in-service date | May 2026 → Dec 2026 |
| June 1, 2026 | 80630 | Projected in-service date | Jan 2026 → May 2026 |
| June 1, 2026 | 99453W | Projected in-service date | May 2026 → Dec 2026 |
| February 1, 2026 | 80630 | Status as reported | Planned → Under Construction |
| February 1, 2026 | 80630 | Projected in-service date | Dec 2025 → Jan 2026 |
| February 1, 2026 | 81238 | Projected in-service date | Jun 2029 → May 2028 |
| February 1, 2026 | 99453W | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 99453X | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 99453X | Projected in-service date | Oct 2029 → May 2026 |
| October 1, 2025 | 99453W | First listed | on the Future tab |
| October 1, 2025 | 99453X | First listed | on the Future tab |
| June 1, 2025 | 80630 | Moved between tabs | Future → Current-year planned |
| June 1, 2025 | 81238 | Projected in-service date | Jun 2027 → Jun 2029 |
| June 1, 2025 | 89993 | Moved between tabs | Future → Cancelled |
| February 1, 2025 | 89993 | First listed | on the Future tab |
| June 1, 2024 | 80630 | First listed | on the Future tab |
| June 1, 2024 | 81238 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.
Site Scanner