Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Tarrant County. First named in the release with data as of October 1, 2024.

Tarrantcounty as printed
138, 345kV
ONCORutility
2projects listed

Also printed as: Base Camp Switch

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Tarrant, TX: ERCOT queue, 4 active of 4 · SPP queue, 0 active of 1. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Wingjet_Switch_138kV
Establish Wingjet 138 kV Switch
ERCOT project 105008
ONCOR
Tier 4
Planned
Future tab
138 May 2027 Base Camp Switch to Hicks Switch
Tarrant County
Base Camp Switch, Hicks Switch
Oncor_MW_62445_BaseCamp(FKA_EglMnt)_138kV_SwitchRebuild
Rebuild existing Eagle Mountain 345/138 kV Switch and rename to Base Camp 345/138 kV Switch
ERCOT project 111223 · utility no. M5261 · RPG 22RPG039
ONCOR
Tier 3
Under Construction
Current-year planned tab
345 Dec 2026 Base Camp to Base Camp
Tarrant County
Base Camp

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
October 1, 2026111223First listedon the Current-year planned tab
July 13, 2026105008Moved between tabsCurrent-year planned → Future
July 13, 2026105008Projected in-service dateMay 2026 → May 2027
June 1, 2026105008First listedon the Current-year planned tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.