Temple
Named in 11 listed projects in ERCOT’s transmission project tracking workbook, in Bell County. First named in the release with data as of February 1, 2015.
Also printed as: Temple Switch
A HIFLD substation record has the same name and county: TEMPLE SWITCHING (BELL County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Bell, TX: ERCOT queue, 14 active of 14. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Rebuild the Temple - Temple Pecan Creek Switch 345 kV Double Circuit Line Rebuild the Temple - Temple Pecan Creek 345 kV Lines ERCOT project 110018A · utility no. R6532 · RPG 25RPG009 |
ONCOR Tier 1 |
Planned Future tab |
345 | May 2029 | Temple to Temple Pecan Creek Bell County |
Temple, Temple Pecan Creek |
| Upgrade Temple Switch - Voss Lake Switch - Sandow Switch 138 kV Line ERCOT project 110026 · utility no. R6531 · RPG 25RPG009 |
ONCOR Tier 1 |
Planned Future tab |
138 | May 2028 | Temple to Sandow Bell / Milam County |
Temple, Sandow |
| Rebuild Bell County East Switch - Bob White Switch - Temple Switch 345 kV Double Circuit Line ERCOT project 110332 · utility no. R6568 |
ONCOR Tier 3 |
Conceptual Future tab |
345 | Dec 2032 | Bell County East to Temple Bell County |
Bell County East, Temple |
| Add Temple Switch - Fryers Creek Switch 138 kV Line Ckt #2 ERCOT project 110340 · utility no. R6572 |
ONCOR Tier 4 |
Conceptual Future tab |
138 | Dec 2030 | Temple to Fryers Creek Bell County |
Temple, Fryers Creek |
| Upgrade Temple - Minerva 69 kV Line Upgrade Temple - Marak 69 kV Line ERCOT project 66206A · utility no. R6186 · RPG 22RPG034 |
ONCOR Tier 3 |
Planned Current-year planned tab |
69 | Sep 2026 | Temple to Marak Bell / Milam County |
Temple, Marak |
| Temple - Temple Pecan 138 kV 2nd Circuit ERCOT project 76572 · utility no. R6235 |
ONCOR Tier 1 |
Planned Current-year planned tab |
138 | Dec 2026 | Temple to Temple Pecan Creek Bell County |
Temple, Temple Pecan Creek |
| Rebuild Temple Switch and install auto #2 ERCOT project 76660 · utility no. R6197 · RPG 24RPG001 · RTP 2023-NC60 |
ONCOR Tier 1 |
Planned Current-year planned tab |
345 | Dec 2026 | Temple to Temple Bell County |
Temple |
| No title printed ERCOT project 87367 · RPG 24RPG001 |
BEPC Tier 1 |
Planned Future tab |
138 | Jan 2028 | Temple Switch to Poage Bell County |
Temple Switch, Poage |
| Rebuild the Fryers Creek - Temple 138 kV Line Rebuild the Fryers Creek - Temple 138 kV Line on new structures ERCOT project 87677 · utility no. R6335 · RPG 24RPG001 |
ONCOR Tier 1 |
Planned Future tab |
138 | Oct 2027 | Fryers Creek to Temple Bell County |
Fryers Creek, Temple |
| Belton - Temple 138 kV Line Rebuild the Belton - Temple 138 kV Line ERCOT project 87709 · utility no. R6199 · RPG 24RPG001 · RTP 2023-NC5, 2023-NC17 |
ONCOR Tier 1 |
Planned Future tab |
138 | Dec 2027 | Belton to Temple Bell County |
Belton, Temple |
| Rebuild the Paramount - Temple 345 kV DCKT Line ERCOT project 99389 · utility no. R6402 |
ONCOR Tier 1 |
Planned Future tab |
345 | Dec 2028 | Tower to Temple Bell County |
Tower, Temple |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 110340 | Status as reported | Planned → Conceptual |
| July 13, 2026 | 110018A | First listed | on the Future tab |
| July 13, 2026 | 110026 | First listed | on the Future tab |
| July 13, 2026 | 110332 | First listed | on the Future tab |
| July 13, 2026 | 110340 | First listed | on the Future tab |
| February 1, 2026 | 66206A | First listed | on the Current-year planned tab |
| February 1, 2026 | 76572 | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 76572 | Projected in-service date | Jun 2026 → Dec 2026 |
| February 1, 2026 | 76660 | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 76660 | Projected in-service date | Jun 2026 → Dec 2026 |
| February 1, 2026 | 87367 | Projected in-service date | Oct 2027 → Jan 2028 |
| February 1, 2026 | 87677 | Projected in-service date | Dec 2027 → Oct 2027 |
| February 1, 2026 | 87709 | Projected in-service date | Dec 2028 → Dec 2027 |
| October 1, 2025 | 87677 | Projected in-service date | May 2027 → Dec 2027 |
| October 1, 2025 | 99389 | First listed | on the Future tab |
| June 1, 2025 | 66206A | No longer listed | future |
| October 1, 2024 | 76572 | Projected in-service date | Dec 2025 → Jun 2026 |
| October 1, 2024 | 76660 | Projected in-service date | Dec 2025 → Jun 2026 |
| October 1, 2024 | 87367 | First listed | on the Future tab |
| October 1, 2024 | 87677 | First listed | on the Future tab |
| October 1, 2024 | 87709 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.