White Oak
Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Brazoria County. First named in the release with data as of June 1, 2024.
Described as new. The quoted wording calls this substation new. “New TNMP White Oak substation” — project 82851A description, as the utility reported it
No HIFLD substation record has this name in this county (a record of the same name exists in another county).
Generation interconnection requests filed in Brazoria, TX: ERCOT queue, 54 active of 63. Same county, not the same substation.
Location
29.1990, -95.4004 · Brazoria County, TX · view on a map
Parcel or address in a filing. A filing names the parcel or address; the point is its center. Accurate to about ±350 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: City of Angleton staff report (Council meeting 2025-08-26, Ordinance No. 20250826-009) names the site: the 'TNMP/CenterPoint White Oak Substation property located adjacent and north of 3343 E Mulberry St/ HWY 35, Angleton, TX 77515', a 41.876-acre Texas New Mexico Power Company tract (Doc. 2023045431) on the west side of SH 35; its annexation exhibit draws the tract with a 1,293.90 ft north line. Brazoria Appraisal District parcel 168906 (owner Texas New Mexico Power Co, 'A0318 T S LEE BLOCK 42 TRACT 39A-40-41-41C-41D-46A1-47A', via the TxGIO StratMap statewide parcel layer) has four polygons totalling ~36 GIS acres, spanning 29.1965-29.2006 N and 95.3970-95.4024 W; its north polygon is ~390 m wide, matching the exhibit's north line. Point is the area-weighted centroid of those polygons. The yard's position inside the ~40-acre tract is not printed (the SUP covers 'Electrical Power Distribution Substations', plural): +/- ~350 m.
Note: Not the CenterPoint 'White Oak Substation' in OpenStreetMap (way 128672826, 345/138/69 kV), which is in north Houston, Harris County; same name, different station. The Angleton report calls it a 'TNMP/CenterPoint' site and TPIT 82851B matches the CNP in-service date 'to interconnect together'. TPIT 82851B also carries 2027-05 in its actual-date field while its status is Planned.
County: the Census county at this point.
Sources: City of Angleton, agenda summary/staff report: annexation of 26.084 acres for the TNMP/CenterPoint White Oak Substation (Ordinance No. 20250826-009), with zoning map, annexation exhibit and aerial map (2025-08-26), pp.1-3, 7 · TxGIO StratMap Land Parcels (Brazoria Appraisal District, tax year 2026): parcel 168906, Texas New Mexico Power Co (tax year 2026) · ERCOT TPIT, projects 82851A, 82851B (release 39, 2026-10-01). Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Adds TNMP White Oak Substation New TNMP White Oak substation. ERCOT project 82851A |
TNMP Tier 4 |
Planned Future tab |
138 | May 2027 | No terminals printed Brazoria County |
White Oak |
| Adds TNMP White Oak Substation In-service Whiteoak bus and loads, and match CNP ISD date to interconnect together. ERCOT project 82851B |
TNMP Tier 4 |
Planned Future tab |
138 | May 2027 actual 2027-05 |
No terminals printed Brazoria County |
White Oak |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 82851A | First listed | on the Future tab |
| October 1, 2026 | 82851B | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.