Devine
Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Medina County. First named in the release with data as of February 1, 2015.
Also printed as: Devine Switch
A HIFLD substation record has the same name and county: DEVINE (MEDINA County), DEVINE (MEDINA County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Medina, TX: ERCOT queue, 7 active of 8. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Devine Switch breaker addition Adds breakers to Devine Switch to allow closing of normally open Devine Switch to Devine. Creates 3- terminal switching station ERCOT project 1549 |
STEC Tier 4 |
Planned Future tab |
69 | May 2028 | Devine Switch Medina County |
Devine Switch |
| Devine: Install Cap Bank Convert the Big Foot to Dilley 69 kV line to 138 kV, rebuild the Dilley to Dilley Switch 69 kV line, and reroute the Big Foot to Dilley line from Dilley to Dilley Switch ERCOT project 80319 · utility no. TA2018040 · RPG 23RPG024 |
AEP TCC/ETT Tier 4 |
Planned Future tab |
138 | Feb 2028 | Devine Medina County |
Devine |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 80319 | Moved between tabs | Current-year planned → Future |
| October 1, 2026 | 80319 | Projected in-service date | Dec 2026 → Feb 2028 |
| June 1, 2026 | 80319 | Projected in-service date | Mar 2026 → Dec 2026 |
| February 1, 2026 | 1549 | Projected in-service date | Dec 2030 → May 2028 |
| February 1, 2026 | 80319 | Moved between tabs | Future → Current-year planned |
| October 1, 2025 | 80319 | Projected in-service date | Dec 2026 → Mar 2026 |
| February 1, 2025 | 1549 | Projected in-service date | Dec 2027 → Dec 2030 |
| October 1, 2024 | 80319 | Projected in-service date | Sep 2026 → Dec 2026 |
| June 1, 2024 | 80319 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.