Jeanetta

Named in 12 listed projects in ERCOT’s transmission project tracking workbook, in Harris County. First named in the release with data as of June 1, 2016.

Harriscounty as printed
138, 345kV
CNPutility
12projects listed

A HIFLD substation record has the same name and county: JEANETTA (HARRIS County). The names agree; that does not confirm they are the same facility.

Generation interconnection requests filed in Harris, TX: ERCOT queue, 30 active of 35 · MISO queue, 0 active of 1. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
High Voltage Mitigation - WA Parish Area
Install (2) 40 MVAr shunt reactors on the tertiary of Jeanetta Auto A1
ERCOT project 104744C
CNP
Tier 4
Planned
Future tab
345 Dec 2027 Jeanetta
Harris County
Jeanetta
High Voltage Mitigation - WA Parish Area
Install (2) 40 MVAr shunt reactors on the tertiary of Jeanetta Auto A2
ERCOT project 104744D
CNP
Tier 4
Planned
Future tab
345 Dec 2027 Jeanetta
Harris County
Jeanetta
BP24 Sub Upgrades
Upgrade Jeanetta to WA Parish Ckt.64A to increase thermal limits
ERCOT project 73371F
CNP
Tier 4
In-Service
Completed tab
138 Jan 2025
actual 2025-06
Jeanetta to WA Parish
Harris / Fort Bend County
Jeanetta, WA Parish
BP24 Sub Upgrades
Upgrade White Oak to Jeanetta Ckt.72B to increase thermal limits
ERCOT project 73371H
CNP
Tier 4
In-Service
Completed tab
345 Jan 2025
actual 2025-02
White Oak to Jeanetta
Harris County
White Oak, Jeanetta
Jeanetta Auto Upgrades
Replace existing 600 MVA Jeanetta Auto A1 with 800 MVA autotransformer
ERCOT project 78490A · RPG 23RPG031
CNP
Tier 3
In-Service
Completed tab
345 Oct 2025
actual 2025-05
Jeanetta
Harris County
Jeanetta
Jeanetta Auto Upgrades
Replace existing 600 MVA Jeanetta Auto A3 with 800 MVA autotransformer
ERCOT project 78490B · RPG 23RPG031
CNP
Tier 3
In-Service
Completed tab
345 Oct 2025
actual 2025-03
Jeanetta
Harris County
Jeanetta
Upgrade Ckt 25 Jeanetta to Westwood to increase thermal limits
ERCOT project 87346
CNP
Tier 4
Planned
Current-year planned tab
138 Dec 2026
actual 2026-07
Westwood to Jeanetta
Harris County
Westwood, Jeanetta
Upgrade to increase thermal limits as part of FRM upgrades
Upgrade Jeanetta to WA Parish Ckt.64A to increase thermal limits as part of FRM upgrades
ERCOT project 87479E
CNP
Tier 4
Conceptual
Current-year planned tab
345 Jul 2025 Jeanetta to WAP
Harris / Fort Bend County
Jeanetta, WAP
Upgrade to increase thermal limits as part of FRM upgrades
Upgrade Bellaire to Jeanetta Ckt.64B to increase thermal limits as part of FRM upgrades
ERCOT project 87479F
CNP
Tier 4
Conceptual
Current-year planned tab
345 Jul 2025 Bellaire to Jeanetta
Harris County
Bellaire, Jeanetta
Facility Ratings Methodology (FRM) Upgrades
Upgrade Jeanetta to WA Parish Ckt.64A to increase thermal limits as part of FRM upgrades
ERCOT project 90232E
CNP
Tier 4
Planned
Current-year planned tab
345 Sep 2026 Jeanetta to WA Parish
Harris / Fort Bend County
Jeanetta, WA Parish
Facility Ratings Methodology (FRM) Upgrades
Upgrade Bellaire to Jeanetta Ckt.64B to increase thermal limits as part of FRM upgrades
ERCOT project 90232F
CNP
Tier 4
Planned
Current-year planned tab
345 Aug 2026 Bellaire to Jeanetta
Harris County
Bellaire, Jeanetta
Facility Ratings Methodology Phase 2 (FRM2) Upgrades
Upgrade Ckt.72A Jeanetta to WA Parish to increase thermal limits as part of FRM2 upgrades.
ERCOT project 99453K
CNP
Tier 4
Planned
Current-year planned tab
345 Dec 2026 Jeanetta to WA Parish
Harris County
Jeanetta, WA Parish

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
October 1, 202690232EProjected in-service dateJul 2026 → Sep 2026
October 1, 202690232FProjected in-service dateJul 2026 → Aug 2026
July 13, 202687479EStatus as reportedPlanned → Conceptual
July 13, 202687479FStatus as reportedPlanned → Conceptual
July 13, 202690232EProjected in-service dateJun 2026 → Jul 2026
July 13, 202690232FProjected in-service dateJun 2026 → Jul 2026
July 13, 2026104744CProjected in-service dateOct 2027 → Dec 2027
July 13, 2026104744DProjected in-service dateOct 2027 → Dec 2027
July 13, 202690232EProjected in-service dateMar 2026 → Jun 2026
July 13, 202690232FProjected in-service dateMar 2026 → Jun 2026
July 13, 202699453KProjected in-service dateMay 2026 → Dec 2026
June 1, 2026104744CFirst listedon the Future tab
June 1, 2026104744DFirst listedon the Future tab
June 1, 202690232EProjected in-service dateJan 2026 → Mar 2026
June 1, 202690232FProjected in-service dateJan 2026 → Mar 2026
February 1, 202678490AMoved between tabsCurrent-year planned → Completed
February 1, 202678490AStatus as reportedPlanned → In-Service
February 1, 202678490BMoved between tabsCurrent-year planned → Completed
February 1, 202678490BStatus as reportedPlanned → In-Service
February 1, 202687346Moved between tabsFuture → Current-year planned
February 1, 202687346Projected in-service dateMay 2026 → Dec 2026
February 1, 202690232EProjected in-service dateSep 2025 → Jan 2026
February 1, 202690232FProjected in-service dateSep 2025 → Jan 2026
February 1, 202699453KMoved between tabsFuture → Current-year planned
October 1, 202590232EProjected in-service dateJul 2025 → Sep 2025
October 1, 202590232FProjected in-service dateJul 2025 → Sep 2025
October 1, 202599453KFirst listedon the Future tab
June 1, 202573371FStatus as reportedPlanned → In-Service
June 1, 202573371HStatus as reportedPlanned → In-Service
June 1, 202578490AMoved between tabsFuture → Current-year planned
June 1, 202578490BMoved between tabsFuture → Current-year planned
June 1, 202587479EMoved between tabsFuture → Current-year planned
June 1, 202587479FMoved between tabsFuture → Current-year planned
June 1, 202590232EMoved between tabsFuture → Current-year planned
June 1, 202590232FMoved between tabsFuture → Current-year planned
February 1, 202573371FProjected in-service dateJun 2024 → Jan 2025
February 1, 202573371HMoved between tabsFuture → Completed
February 1, 202573371HProjected in-service dateNov 2024 → Jan 2025
February 1, 202578490AProjected in-service dateMay 2025 → Oct 2025
February 1, 202578490BProjected in-service dateMay 2025 → Oct 2025
February 1, 202590232EFirst listedon the Future tab
February 1, 202590232FFirst listedon the Future tab
October 1, 202473371FProjected in-service dateMay 2024 → Jun 2024
October 1, 202473371HMoved between tabsCompleted → Future
October 1, 202473371HProjected in-service dateMay 2024 → Nov 2024
October 1, 202487346First listedon the Future tab
October 1, 202487479EFirst listedon the Future tab
October 1, 202487479FFirst listedon the Future tab
June 1, 202473371FMoved between tabsFuture → Completed
June 1, 202473371HMoved between tabsFuture → Completed

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.