Named in 11 listed projects in ERCOT’s transmission project tracking workbook, in Fort Bend County. First named in the release with data as of February 1, 2015.

Fort Bendcounty as printed
138, 345kV
CNPutility
11projects listed

A HIFLD substation record has the same name and county: W.A. PARISH (138KV) (FORT BEND County). The names agree; that does not confirm they are the same facility.

Generation interconnection requests filed in Fort Bend, TX: ERCOT queue, 10 active of 14. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
WA Parish 138kV Fault Upgrade with Bus Reactors
Install (2) 5-Ohm Reactors at WA Parish as a fault duty upgrade. Split the existing WA Parish 138kV West bus. Install equipment to maintain 80KA fault duty.
ERCOT project 109615A
CNP
Tier 4
Planned
Future tab
138 May 2029 WA Parish to WA Parish
Fort Bend County
WA Parish
WA Parish 138kV Fault Upgrade with Bus Reactors
Modeling change only for this line position (No reposition
ERCOT project 109615B
CNP
Tier 4
Planned
Future tab
138 May 2029 WA Parish
Fort Bend County
WA Parish
WA Parish 138kV Fault Upgrade with Bus Reactors
Reposition existing WAP GT-2 generator lead as part of WAP 138kV West reactor additions
ERCOT project 109615C
CNP
Tier 4
Planned
Future tab
138 May 2029 WA Parish
Fort Bend County
WA Parish
WA Parish 138kV Fault Upgrade with Bus Reactors
Reposition existing Ckt.02B WA Parish to Nash (Phelps) as part of WAP 138kV West reactor additions
ERCOT project 109615D
CNP
Tier 4
Planned
Future tab
138 May 2029 WA Parish to Phelps
Fort Bend County
WA Parish, Phelps
WA Parish 138kV Fault Upgrade with Bus Reactors
Reposition existing WAP GT-1 generator lead as part of WAP 138kV West reactor additions
ERCOT project 109615E
CNP
Tier 4
Planned
Future tab
138 May 2029 WA Parish
Fort Bend County
WA Parish
WA Parish 138kV Fault Upgrade with Bus Reactors
Reposition existing Standby transformers ST5A / ST5B as part of WAP 138kV West reactor additions
ERCOT project 109615H
CNP
Tier 4
Planned
Future tab
138 May 2029 WA Parish
Fort Bend County
WA Parish
BP24 Sub Upgrades
Upgrade Whaley to WA Parish Ckt.72F to increase thermal limits
ERCOT project 73371E
CNP
Tier 4
Planned
Current-year planned tab
138 Nov 2026
actual 9999-01
Whaley to WA Parish
Fort Bend County
Whaley, WA Parish
BP24 Sub Upgrades
Upgrade Jeanetta to WA Parish Ckt.64A to increase thermal limits
ERCOT project 73371F
CNP
Tier 4
In-Service
Completed tab
138 Jan 2025
actual 2025-06
Jeanetta to WA Parish
Harris / Fort Bend County
Jeanetta, WA Parish
Facility Ratings Methodology (FRM) Upgrades
Upgrade Jeanetta to WA Parish Ckt.64A to increase thermal limits as part of FRM upgrades
ERCOT project 90232E
CNP
Tier 4
Planned
Current-year planned tab
345 Sep 2026 Jeanetta to WA Parish
Harris / Fort Bend County
Jeanetta, WA Parish
Facility Ratings Methodology Phase 2 (FRM2) Upgrades
Upgrade Ckt.02B WA Parish to Nash to increase thermal limits as part of FRM2 upgrades.
ERCOT project 99453I
CNP
Tier 4
Planned
Current-year planned tab
138 Nov 2026 WA Parish to Nash
Fort Bend / Brazoria County
WA Parish, Nash
Facility Ratings Methodology Phase 2 (FRM2) Upgrades
Upgrade Ckt.98G Smithers to WA Parish to increase thermal limits as part of FRM2 upgrades.
ERCOT project 99453Q
CNP
Tier 4
Planned
Future tab
345 Oct 2029 Smithers to WA Parish
Fort Bend County
Smithers, WA Parish

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
October 1, 202690232EProjected in-service dateJul 2026 → Sep 2026
October 1, 202699453IProjected in-service dateJul 2026 → Nov 2026
July 13, 202690232EProjected in-service dateJun 2026 → Jul 2026
July 13, 202699453IProjected in-service dateJun 2026 → Jul 2026
July 13, 2026109615AFirst listedon the Future tab
July 13, 2026109615BFirst listedon the Future tab
July 13, 2026109615CFirst listedon the Future tab
July 13, 2026109615DFirst listedon the Future tab
July 13, 2026109615EFirst listedon the Future tab
July 13, 2026109615HFirst listedon the Future tab
July 13, 202690232EProjected in-service dateMar 2026 → Jun 2026
July 13, 202699453IProjected in-service dateMay 2026 → Jun 2026
June 1, 202690232EProjected in-service dateJan 2026 → Mar 2026
February 1, 202673371EMoved between tabsFuture → Current-year planned
February 1, 202690232EProjected in-service dateSep 2025 → Jan 2026
February 1, 202699453IMoved between tabsFuture → Current-year planned
October 1, 202573371EProjected in-service dateMay 2026 → Nov 2026
October 1, 202590232EProjected in-service dateJul 2025 → Sep 2025
October 1, 202599453IFirst listedon the Future tab
October 1, 202599453QFirst listedon the Future tab
June 1, 202573371FStatus as reportedPlanned → In-Service
June 1, 202590232EMoved between tabsFuture → Current-year planned
February 1, 202573371EMoved between tabsCompleted → Future
February 1, 202573371EProjected in-service dateMay 2024 → May 2026
February 1, 202573371FProjected in-service dateJun 2024 → Jan 2025
February 1, 202590232EFirst listedon the Future tab
October 1, 202473371EMoved between tabsFuture → Completed
October 1, 202473371EProjected in-service dateMay 2025 → May 2024
October 1, 202473371FProjected in-service dateMay 2024 → Jun 2024
June 1, 202473371FMoved between tabsFuture → Completed

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.