Missouri City
Named in 4 listed projects in ERCOT’s transmission project tracking workbook, in Harris County. First named in the release with data as of June 1, 2022.
No HIFLD substation record has this name in this county (a record of the same name exists in another county).
Generation interconnection requests filed in Harris, TX: ERCOT queue, 30 active of 35 · MISO queue, 0 active of 1. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Missouri City Low Profile Conversion Convert Missouri City distribution substation to low-profile. Install Missouri City TR4 at Ckt.02A Blueridge to Missouri City to DEWALT. ERCOT project 105135 |
CNP Tier 4 |
Planned Future tab |
138 | Apr 2027 | Missouri City to Blueridge / DEWALT Harris County |
Missouri City, Blueridge, DEWALT |
| Missouri City to HO Clarke - Hardening Upgrades Rebuild/reconductor Ckt.02A HO Clarke to Blue Ridge to Missouri City as a Hardening upgrade. Rebuild/reconductor Ckt.02A Blue Ridge tap section as a Hardening upgrade. ERCOT project 109610A |
CNP Tier 4 |
Planned Future tab |
138 | Dec 2027 | HO Clarke to Missouri City Harris County |
HO Clarke, Missouri City |
| Missouri City to HO Clarke - Hardening Upgrades Rebuild/reconductor portions of Ckt.05A HO Clarke to Blue Ridge as a Hardening upgrade. ERCOT project 109610B |
CNP Tier 4 |
Planned Future tab |
138 | Dec 2027 | HO Clarke to Missouri City Harris County |
HO Clarke, Missouri City |
| Hardening Project for circuit 05 WAP to Missouri City(26RPG021). ERCOT project 109759 · RPG 26RPG021 |
CNP Tier 4 |
Planned Future tab |
138 | Jun 2028 | HO Clarke to Missouri City Harris County |
HO Clarke, Missouri City |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 105135 | Projected in-service date | Mar 2027 → Apr 2027 |
| October 1, 2026 | 109759 | Projected in-service date | Dec 2027 → Jun 2028 |
| July 13, 2026 | 105135 | Projected in-service date | Feb 2027 → Mar 2027 |
| July 13, 2026 | 109759 | Projected in-service date | Oct 2027 → Dec 2027 |
| July 13, 2026 | 105135 | First listed | on the Future tab |
| July 13, 2026 | 109610A | First listed | on the Future tab |
| July 13, 2026 | 109610B | First listed | on the Future tab |
| July 13, 2026 | 109759 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.