Primavera
Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Nueces County. First named in the release with data as of October 1, 2023.
Described as new. The quoted wording calls this substation new. “Primavera 138 kV: Construct new station” — project 76918 title, as the utility reported it
Reported complete. Project 76918 is on the Completed tab (actual in-service 2025-06); Project 87031 is on the Completed tab (actual in-service 2029-03), as the utility reported it. That indicates the substation may now be built; it is not a confirmation.
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Nueces, TX: ERCOT queue, 13 active of 13. Same county, not the same substation.
Location
Nueces County, TX
County only. A source prints the county; no point is published. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: No point. TPIT names no line or neighbouring station, OpenStreetMap has no feature named Primavera, and no public document found describes the site.
Note: Already in service: TPIT 76918 is on the Completed tab with status 'In-Service' (ISD 2025-06), and 87031 (a storage terminal at Primavera) is In-Service (2026-03).
Sources: ERCOT TPIT, project(s) 76918, 87031 (release 39, 2026-10-01). Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Primavera 138 kV: Construct new station New station to serve Tesla load ERCOT project 76918 · utility no. TP2023059 |
AEP TCC Tier 4 |
In-Service Completed tab |
138 | Jun 2025 actual 2025-06 |
Primavera Nueces County |
Primavera |
| Primavera: Construct New 138 kV Terminal Interconnect Project Lynx Storage to the Primavera 138 kV station ERCOT project 87031 · utility no. TP2024100 |
AEP TCC Tier 4 |
In-Service Completed tab |
138 | Mar 2026 actual 2029-03 |
Primavera Nueces County |
Primavera |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 76918 | Moved between tabs | Current-year planned → Completed |
| October 1, 2026 | 87031 | Moved between tabs | Current-year planned → Completed |
| October 1, 2026 | 87031 | Status as reported | Planned → In-Service |
| October 1, 2026 | 87031 | Projected in-service date | Jun 2026 → Mar 2026 |
| February 1, 2026 | 76918 | Status as reported | Planned → In-Service |
| February 1, 2026 | 87031 | Moved between tabs | Future → Current-year planned |
| October 1, 2025 | 76918 | Projected in-service date | May 2025 → Jun 2025 |
| October 1, 2025 | 87031 | Projected in-service date | Nov 2026 → Jun 2026 |
| June 1, 2025 | 76918 | Moved between tabs | Future → Current-year planned |
| February 1, 2025 | 76918 | Projected in-service date | Mar 2025 → May 2025 |
| February 1, 2025 | 87031 | Projected in-service date | Apr 2026 → Nov 2026 |
| October 1, 2024 | 87031 | First listed | on the Future tab |
| June 1, 2024 | 76918 | Status as reported | Conceptual → Planned |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.