Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Nueces County. First named in the release with data as of October 1, 2023.

Nuecescounty as printed
138kV
AEP TCCutility
2projects listed

Described as new. The quoted wording calls this substation new. “Primavera 138 kV: Construct new station” — project 76918 title, as the utility reported it

Reported complete. Project 76918 is on the Completed tab (actual in-service 2025-06); Project 87031 is on the Completed tab (actual in-service 2029-03), as the utility reported it. That indicates the substation may now be built; it is not a confirmation.

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Nueces, TX: ERCOT queue, 13 active of 13. Same county, not the same substation.

Location

Nueces County, TX

County only. A source prints the county; no point is published. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

How it was located: No point. TPIT names no line or neighbouring station, OpenStreetMap has no feature named Primavera, and no public document found describes the site.

Note: Already in service: TPIT 76918 is on the Completed tab with status 'In-Service' (ISD 2025-06), and 87031 (a storage terminal at Primavera) is In-Service (2026-03).

Sources: ERCOT TPIT, project(s) 76918, 87031 (release 39, 2026-10-01). Researched by Substation Scout; checked November 21, 2026.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Primavera 138 kV: Construct new station
New station to serve Tesla load
ERCOT project 76918 · utility no. TP2023059
AEP TCC
Tier 4
In-Service
Completed tab
138 Jun 2025
actual 2025-06
Primavera
Nueces County
Primavera
Primavera: Construct New 138 kV Terminal
Interconnect Project Lynx Storage to the Primavera 138 kV station
ERCOT project 87031 · utility no. TP2024100
AEP TCC
Tier 4
In-Service
Completed tab
138 Mar 2026
actual 2029-03
Primavera
Nueces County
Primavera

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
October 1, 202676918Moved between tabsCurrent-year planned → Completed
October 1, 202687031Moved between tabsCurrent-year planned → Completed
October 1, 202687031Status as reportedPlanned → In-Service
October 1, 202687031Projected in-service dateJun 2026 → Mar 2026
February 1, 202676918Status as reportedPlanned → In-Service
February 1, 202687031Moved between tabsFuture → Current-year planned
October 1, 202576918Projected in-service dateMay 2025 → Jun 2025
October 1, 202587031Projected in-service dateNov 2026 → Jun 2026
June 1, 202576918Moved between tabsFuture → Current-year planned
February 1, 202576918Projected in-service dateMar 2025 → May 2025
February 1, 202587031Projected in-service dateApr 2026 → Nov 2026
October 1, 202487031First listedon the Future tab
June 1, 202476918Status as reportedConceptual → Planned

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.