Named in 4 listed projects in ERCOT’s transmission project tracking workbook, in Harris County. First named in the release with data as of February 1, 2015.
A HIFLD substation record has the same name and county: DUNLAVY (HARRIS County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Harris, TX: ERCOT queue, 30 active of 35 · MISO queue, 0 active of 1. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Dunlavy to HO Clarke Ckt.40A Partial Reconductor Reconductor portions of Ckt.40A Dunlavy to HO Clarke ahead of future 138kV conversions ERCOT project 71106 · RPG 22RPG019 |
CNP Tier 4 |
In-Service Completed tab |
69 | Aug 2026 actual 2026-07 |
Dunlavy to HO Clarke Harris County |
Dunlavy, HO Clarke |
| Heights 138kV Loop Conversion Rebuild/Reconductor Dead Ckt.40Z to prepare for 138kV Conversion. De-energize Ckt.31C Dunlavy to Heights and repurpose as Ckt.09D tap to Dunlavy TR1 load. ERCOT project 73578A |
CNP Tier 4 |
Planned Current-year planned tab |
138 | Oct 2026 | Dunlavy to Heights Harris County |
Dunlavy, Heights |
| Heights 138kV Loop Conversion Repurpose/retire existing 69kV Ckts 34A/34B. Unbundle parallel-bundled portions of Ckt.40A HOC to Dunlavy. Reconfigure Ckt.40A to reach a Minimum 1-2000AAC limiting conductor @ 90/120Deg. Upgrade HOC line relaying on 69kV Ckt.40A HOC to Dunlavy. ERCOT project 73578B |
CNP Tier 4 |
Planned Current-year planned tab |
138 | Oct 2026 | Dunlavy to HO Clarke Harris County |
Dunlavy, HO Clarke |
| Heights 138kV Loop Conversion Reconfigure Ckt.40A Dunlavy to HO Clarke with a temporary (BP25 to BP26) configuration. Remove the Dunlavy TR3 tap section from Ckt.40A and install tap section to Ckt.90A. ERCOT project 73578J |
CNP Tier 4 |
In-Service Completed tab |
69 | May 2025 actual 2025-05 |
Dunlavy to HO Clarke Harris County |
Dunlavy, HO Clarke |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 71106 | Moved between tabs | Current-year planned → Completed |
| July 13, 2026 | 71106 | Status as reported | Planned → In-Service |
| June 1, 2026 | 73578J | Status as reported | Planned → In-Service |
| February 1, 2026 | 71106 | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 71106 | Projected in-service date | May 2026 → Aug 2026 |
| February 1, 2026 | 73578A | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 73578A | Projected in-service date | May 2026 → Oct 2026 |
| February 1, 2026 | 73578B | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 73578B | Projected in-service date | May 2026 → Oct 2026 |
| June 1, 2025 | 73578J | Moved between tabs | Future → Completed |
| February 1, 2025 | 73578J | First listed | on the Future tab |
| October 1, 2024 | 73578A | Projected in-service date | Dec 2025 → May 2026 |
| October 1, 2024 | 73578B | Projected in-service date | Dec 2025 → May 2026 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.