Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Houston County. First named in the release with data as of February 1, 2015.
Also printed as: Crockett
A HIFLD substation record has the same name and county: CROCKETT (HOUSTON County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Houston, TX: ERCOT queue, 8 active of 8 · MISO queue, 0 active of 2 · SPP queue, 1 active of 2. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Install Jewett Switch - Crockett Switch 138 kV Line Ckt #2 ERCOT project 110000 · utility no. R6554 |
ONCOR Tier 1 |
Conceptual Future tab |
138 | May 2030 | Jewett Switch to Crockett Switch Leon / Houston County |
Jewett Switch, Crockett Switch |
| Install Crockett Switch - Lufkin Switch 138 kV Line Ckt#2 ERCOT project 110002 · utility no. R6555 |
ONCOR Tier 1 |
Conceptual Future tab |
138 | May 2031 | Crockett Switch to Lufkin Switch Houston / Angelina County |
Crockett Switch, Lufkin Switch |
| Upgrade Palestine-Crockett 69 kV Line Rebuild the Grapeland - Crockett 69 kV Line ERCOT project 66202C · utility no. R6182 · RPG 22RPG035 |
ONCOR Tier 3 |
Planned Future tab |
69 | Sep 2027 | Grapeland to Crockett Houston County |
Grapeland, Crockett |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 110000 | Status as reported | Planned → Conceptual |
| October 1, 2026 | 110002 | Status as reported | Planned → Conceptual |
| July 13, 2026 | 110000 | First listed | on the Future tab |
| July 13, 2026 | 110002 | First listed | on the Future tab |
| October 1, 2025 | 66202C | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.