Rio Medina
Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Medina County. First named in the release with data as of June 1, 2024.
Medinacounty as printed
138kV
STECutility
3projects listed
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Medina, TX: ERCOT queue, 7 active of 8. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Rio Medina substation Adds Rio Medina Load serving station ERCOT project 81590 |
STEC Tier 2 |
Planned Current-year planned tab |
138 | Nov 2026 | Rio Medina Medina County |
Rio Medina |
| Add Rio Medina - Legend Falls Tline Add Rio Medina - Legend Falls Tline as part of the Rio Medina RPG Project ERCOT project 85008 |
STEC Tier 2 |
Planned Future tab |
138 | Jul 2027 | Rio Medina Medina County |
Rio Medina |
| New San Geronimo Substation adds new San Geronimo station on STEC Rio Medina - CPS Legend Falls line ERCOT project 91708 |
STEC Tier 4 |
Planned Future tab |
138 | Jul 2027 | Rio Medina to Legend Falls Medina County |
Rio Medina, Legend Falls |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 81590 | Moved between tabs | Future → Current-year planned |
| October 1, 2026 | 81590 | Projected in-service date | Jan 2027 → Nov 2026 |
| June 1, 2025 | 91708 | First listed | on the Future tab |
| June 1, 2024 | 81590 | First listed | on the Future tab |
| June 1, 2024 | 85008 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.